Orange County NC Website
32 <br /> 1 Chair Bedford asked if the county did not build a new recreation facility, what would the <br /> 2 needed repairs be. <br /> 3 Alan Dorman said $7.5 million would still be needed for repairs. <br /> 4 Chair Bedford asked what kind of programming takes place at the current gym. She <br /> 5 said it is used for basketball in the evenings. <br /> 6 David Stancil said it is used all day for preschool, afterschool, classes throughout the <br /> 7 day, and at night there is basketball and volleyball, rentals from the community, and summer <br /> 8 camps. <br /> 9 Chair Bedford said that if one of the school systems builds an elementary school or <br /> 10 middle school, there would be an option for their gym to be built with an outside door and <br /> 11 separate bathrooms and offices. She said that kind of facility would only be available after 6 <br /> 12 p.m. She said it is expensive, but it was ranked high. She asked if the $7.5 million in repairs <br /> 13 would only help the county limp along with the existing facility without improvements. <br /> 14 Alan Dorman the facility is in need of improvements and the figure includes renovations <br /> 15 and they have also put off several large CIP projects. He said they can do it for less, but it would <br /> 16 be far from idea. <br /> 17 Chair Bedford asked where the new gym would be located. <br /> 18 Travis Myren said there is space by the motor pool and also where it is currently located. <br /> 19 He said the opportunity cost would be that they cannot expand programming and serve more <br /> 20 children. <br /> 21 David Stancil said the current facility is maxed out. <br /> 22 Commissioner Fowler asked if the new one is built, would the existing facility be <br /> 23 demolished. <br /> 24 Chair Bedford said yes. She said there were options for other projects to be adjusted. <br /> 25 She said she thought there should be contingency for escalating costs of capital projects. She <br /> 26 asked if there was a capital reserve fund. <br /> 27 Travis Myren said there is less than $60,000 in that fund. <br /> 28 Chair Bedford asked if there should be a contingency fund that could be tracked so staff <br /> 29 could see what specific expenditures were higher than expected. She asked if that is allowed. <br /> 30 Travis Myren said the expenditure needs to be connected to a capital project. He said <br /> 31 each project carries a contingency of about 8% of the cost of construction. <br /> 32 Kirk Vaughn said the CIP is a plan. He said once funds are borrowed, it needs to be tied <br /> 33 to a project. He said placeholders for future years do not result in borrowing until much later. <br /> 34 He said it could be a project basis or tied to a contingency project as part of the plan. <br /> 35 Commissioner Fowler confirmed that 8% contingency is included. <br /> 36 Travis Myren said yes. <br /> 37 Chair Bedford said the expenses increase each year and they have not been very <br /> 38 accurate on the operating side. <br /> 39 Kirk Vaughn said it has been an extraordinary period of expenditure and inflation. He <br /> 40 said that it has operating impacts and those are reflected on page 47. <br /> 41 Travis Myren said they cannot borrow for operating costs. <br /> 42 Chair Bedford said it has an impact on whether they should do the project. She said that <br /> 43 she learned that $23 million is county pay-go and she asked if there is a history of pay-go. She <br /> 44 said if they are framing $6.4 million causing a tax increase, it really is all of the projects together. <br /> 45 She said she did not know that they were doing prior year pay-go. <br /> 46 Kirk Vaughn said not every CIP cost is "borrowable." He said the $23 million in pay-go is <br /> 47 over 10 years. He said there is a summary of the county capital on page 49, which is an <br /> 48 incremental increase over time. <br /> 49 Travis Myren said that if it were not for the school projects there would not be a tax <br /> 50 increase. <br />