Orange County NC Website
30 <br /> 1 Slide #36 <br /> FY2025-35 Recommended Solid Waste Projects <br /> I i I <br /> I <br /> it i i s�E <br /> Eos <br /> I <br /> r----------- I A <br /> b_ ! 1 astmi <br /> 1 ern®�� ouvm <br /> m.._, 1 01!M3125 <br /> I FLOOR PLAN OPTION 7 MAINTENANCE BUILDING ADDITION <br /> ❑....• ORANGE COUNTY LANDFILL FLOOR PLAN SD-1 <br /> 154ELR4M58 RP ICINPFL HIlL HC41514 3�E`-� <br /> --NEW GREW BUILDING <br /> RAS,D <br /> ONGE NTY COULANGFILL <br /> ORANGE COUNTY <br /> 36 NOR-rH CAROLINA <br /> 2 <br /> 3 <br /> 4 Slide #37 <br /> FY2025-35 Recommended Solid Waste Projects <br /> Environmental Protection and Climate Action <br /> Transporlatlon Goals <br /> • Saud Waste Vehicle and Equipment Replacements-$2,988,294 (p. 121) <br /> • New Ac Machine -$6,000 • Replace Front Loader#1963-$455,681 <br /> • Replace Wheel Loader#460 -$284,586 • Replace 5kidsteer#730 -$60,243 <br /> • Replace Hook Truck#1768-$297,024 • Replace Ford F250#852-$49,694 <br /> • Replace 315 D Excavator#433 -$296,604 • Replace Mower#229-$7,290 <br /> • Replace Cat 32 Excavator#462-$337,979 • Replace Mower#226-$8,500 <br /> • Replace Ford Pickup#853 -$87,565 <br /> • Replace Wheel Loader#7154 -$202,967 <br /> • Replace Automated Curbside Truck <br /> 1966 -$447,081 <br /> • Replace Automated Curbside Truck <br /> #1967-$447,081 <br /> ORANGE COUNTY <br /> 3T NORTH CAROLINA <br /> 5 <br /> 6 <br /> 7 <br />