Orange County NC Website
Commissioner Approved Fee Schedule - FY 2025-26 30 <br /> Last <br /> Department/Program Description Current Fee Revision <br /> .039 per square foot per project<5000 sq ft <br /> Commercial Plan Review ($184.minimum) 2025 <br /> .032 per square foot 5000-20,000 sq ft 2025 <br /> .024 per square foot 20,000-150,000 sq ft 2025 <br /> .015 per square foot>150,000 sq ft 2025 <br /> (Additional 15%Town of Hillsborough) 2023 <br /> Building$194+.403 per sf,Electrical$131 <br /> Commercial Renovations and Alterations Plumbing$131;Mechanical$131 2025 <br /> Schedule E <br /> Miscellaneous Bldg Inspections Commercial Residential <br /> Moving Building $194 $131 2025 <br /> Building Demolition $131 $131 2025 <br /> Change of Occupancy/Use $131.00 2025 <br /> Swimming Pools Commercial Residential <br /> Commercial $131 $131 2025 <br /> Residential $131 $131 2025 <br /> Woodstove/Fireplace Commercial Residential <br /> Commercial $63 each appliance $63 each appliance 2025 <br /> Residential $63 each appliance $63 each appliance 2025 <br /> Prefabricated Utility Bldgs. <br /> Commercial Utility Occupancy,Schedule D <br /> Residential $131.00 2025 <br /> Sign Permits $131.00 2025 <br /> Schedule F <br /> Miscellaneous Electrical Commercial Residential <br /> Electrical Inspections Temporary Sery 60 amp $63 $63 2025 <br /> Temporary Sery 60A-100A $63 $63 2025 <br /> Sign Inspections $131 $63 2025 <br /> Gasoline Pumps $63.00 2025 <br /> Miscellaneous Inspections $131 $131 2025 <br /> Schedule G <br /> Electrical Service Changes Commercial Residential <br /> Single Phase <br /> 60-100A $131 $131 2025 <br /> 125-200A $163 $163 2025 <br /> 400A $194 $194 2025 <br /> Three Phase <br /> 150-200A $194 $194 2025 <br /> 400 A $257 $257 2025 <br /> Schedule H Commercial and Residential <br /> Electrical Service Single Phase Three Phase <br /> 30-60A $63 $163 2025 <br /> 70-100A $163 $163 2025 <br /> 125A $194 $194 2025 <br /> 150A $226 $257 2025 <br /> 200A $231.00 $289.00 2025 <br /> 300A $221.00 $289.00 2025 <br /> 400A $289.00 $383.00 2025 <br /> 600A $383 $446 2025 <br /> 800A $446 $609 2025 <br /> 1000A $609 $798 2025 <br /> 1200A $798 $898 2025 <br /> 1400A $861 $1,150 2025 <br />