Browse
Search
Agenda 06-17-2025; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 06-17-2025 Business Meeting
>
Agenda 06-17-2025; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:23:21 AM
Creation date
6/12/2025 10:09:07 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for June 17, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 06-17-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> 1 Commissioner McKee said he wants to make sure they are safe, but this is a private <br /> 2 industry standard that was developed by people that sell this material. <br /> 3 Commissioner Carter asked if there are insurance implications. <br /> 4 Travis Myren said this is in the context of a 10-year plan. He said that as projects get <br /> 5 closer, they can look to see if anything can be pushed out farther. He said a 10-year plan is <br /> 6 meant to capture expected costs so the county can plan. <br /> 7 Chair Bedford said if it can be moved two years, that could save $2-$3 million dollars <br /> 8 and those could be saved for other emergency needs and it would make a difference in debt <br /> 9 service, as well. <br /> 10 Commissioner Fowler asked what the recommended frequency is for full electrical <br /> 11 redoes. <br /> 12 Angel Barnes said she would look into it. <br /> 13 Commissioner McKee said you do not want to wait for things to get bad or for buildings <br /> 14 to collapse because the county delayed necessary improvements. He said that he does not <br /> 15 want to continue the mindset of everything is fine and we can keep doing as they have been <br /> 16 doing. <br /> 17 Commissioner Carter asked if there are any operational savings from the upgrades. <br /> 18 Travis Myren said they are representing a general decline in the rate of increase based <br /> 19 on the energy efficiency. <br /> 20 Chair Bedford said that would have to do with LED lights but not necessary the <br /> 21 transformers and wires. <br /> 22 Commissioner Fowler said the lifespan is 20-30 years and she would like to know where <br /> 23 they are in that. <br /> 24 Chair Bedford said it would be good to have an inspection. <br /> 25 Alan Dorman said West Campus was built in 2009 and he said they built a lot of <br /> 26 buildings between 2007-2009. <br /> 27 Commissioner Fowler said it looks like we are using the 20-year rather than the 20-30- <br /> 28 year plan. <br /> 29 <br /> 30 Slide #13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.