Orange County NC Website
63 <br /> APPLICATION COMPONENTS <br /> REQUIREMENT LIDO SUPPORTING EVIDENCE BOA <br /> FoF <br /> Proper forms 2.2 New application (Attachment 2) and <br /> original application materials. <br /> Site Plan (Attachment 6) <br /> Fees paid 2.2.4(D) Paid on-line via CSS portal <br /> Full description of use 2.7.3(B)(1) New application (Attachment 2) and <br /> • Location original application materials. <br /> • Appearance <br /> • Operational characteristics Site Plan (Attachment 6) <br /> Owner Information 2.7.3(B)(2) New application (Attachment 2) and <br /> original application materials. <br /> Site Plan (Attachment 6) <br /> Information needed for Use 2.7.3(13)(3) New application (Attachment 2) and <br /> Standards original application materials. <br /> Site Plan (Attachment 6) <br /> Site Plans 2.7.3(13)(4) Approved Site Plan and Revised Site <br /> Plan Submitted (Attachment 6) <br /> Preliminary Subdivision Plat (if 2.7.3(13)(5) N/A (No subdivision proposed) N/A <br /> necessary) <br /> List of parcels within 1,000 feet 2.7.3(13)(6) Application (Attachments 2 and 3) <br /> Elevations of all structures 2.7.3(13)(7) Site Plan <br /> Environmental Assessment (or EIS) 2.7.3(13)(8) EIS Not Required (original Application <br /> • Topography for EA) <br /> • Drainage issues <br /> • Natural or Cultural resources <br /> • Mining <br /> • Hazardous Wastes <br /> • Wastewater treatment <br /> • Water usage <br /> Method of Debris Disposal 2.7.3(B)(9) No new construction requiring debris <br /> disposal <br /> Development Schedule 2.7.3(B)(10) No new development N/A <br /> Extended Vesting Request 2.7.3(B)(11) Not requested N/A <br />