Orange County NC Website
Docusign Envelope ID:A7270F65-5835-43DD-BA63-42048AD47F7A <br /> 52 <br /> 11. Applicant shall secure a driveway permit from the NC Department of Transportation prior <br /> to the commencement of land disturbing activities for the driveway off of Old Greensboro <br /> Road; <br /> 12. Development shall abide by the general standards of the Unified Development <br /> Ordinance (UDO) as detailed in Article 6 and the specific standards contained in Section <br /> 5.7.2; <br /> 13. Consistent with applicant testimony from the December 14, 2020, and January 11, 2021 <br /> Board of Adjustment public hearing(s), and the updated site plan/screening exhibit, no <br /> more than 46 cars shall be on-site at any time during a cricket match or practice. Further, <br /> all parking areas shall be screened (improved and overflow) consistent with the <br /> provisions of Section 6.8.7 of the UDO; <br /> 14. In accordance with UDO Sections 5.2 Table of Permitted Uses and 5.7.2 Recreational <br /> Facilities, activities allowed to occur on the property shall be in accordance with the <br /> submitted application package, site plan, and narrative as reviewed by the Orange <br /> County Board of Adjustment on January 25, 2021. <br /> Furthermore, the site plan shall be updated and included as part of the site plan submittal <br /> for development permits; <br /> 15. The applicants shall obtain all applicable development permits from the County <br /> consistent with the approved SUP, including but not limited to: Erosion Control; <br /> Stormwater; and Zoning Compliance; <br /> 16. In accordance with UDO Section 2.7.12 (C) Conditions of Approval, if any condition of <br /> this Special Use Permit is held invalid or void, then this Special Use Permit shall be void <br /> in its entirety and of no effect; <br /> 17. In accordance with UDO Section 2.7.12 (D) Conditions of Approval, the Special Use <br /> Permit shall expire automatically within 12 months of the date of approval if the use has <br /> not commenced or construction has not commenced or proceeded unless a timely <br /> application for extension of this time limit is approved by the Board of Adjustment. <br /> DocuSigned by: <br /> E <br /> /vr�wana?�r 5/29/2025 <br /> 1E6A916ED38546C... <br /> Signatures Date <br />