Browse
Search
6.11.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
6.11.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 4:18:49 PM
Creation date
6/9/2025 4:16:05 PM
Metadata
Fields
Template:
BOCC
Date
6/11/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br /> xhibit D — Proposed Findings of Fac <br /> The Applicant shall be required to provide the proposed findings of fact for the project based on the <br /> specific development standards for a proposed land use as detailed in Article 5 of the LIDO as well as <br /> the general findings as contained in Section 5.3.2 of the UDO: <br /> D SUPPORTI N REQUIREMENT <br /> # REQUIREMENT Section EVIDENCE Condition # <br /> (Findingof Fact <br /> Application Components and Required Submittal Information: <br /> 1. Proper forms 2.2 Proper forms were submitted <br /> 2. Fees paid 2.2.4(D) Proper fees were submitted <br /> Full description of use <br /> 3. ■ Location 2 7 3 E 1 See original SUP <br /> • Appearance ( )( ) <br /> ■ Operational characteristics <br /> 4. Owner Information 2 7 3(B)(2) complete ownership was <br /> information submitted <br /> Information needed for Use ( )( ) <br /> 5' s 2.7.3 B 3 See original SUP <br /> Standards <br /> 6. Site Plans 2.7.3(B)(4) The site plan submitted in an <br /> acceptable manner <br /> 7. List of parcels within 1,000 feet 2.7.3(B)(5) feetweres of submls itted. <br /> 1,000 <br /> feet were submitted. <br /> 8. Elevations of all structures 2.7.3(B)(6) See original SUP <br /> 9. EIS)Environmental Assessment (or 2 7 3(B)(7) N/A <br /> 10. Method of Debris Disposal 2.7.3(B)(8) N/A <br /> 11 Development Schedule 2.7.3(B)(9) Applicant to outline the <br /> schedule upon approval <br /> 12. Extended Vesting Request 2.7.3(B)(10) Applicant has provided <br /> an extended vesting request <br /> Notification Requirements: <br /> Public Notice 2.7.6(A) <br /> 13. • Date Requirements were met <br /> ■ Time <br /> ■ Place <br /> 14. Sign Posting on Property (at least 2.7.6(A)(2) Requirements were met <br /> 10 daysprior) <br /> Mailed Notice 2.7.6(A)(1) <br /> ■ Certified mail <br /> 15. ■ All adjacent property owners Requirements were met <br /> (within 1 ,000 feet) <br /> • Not less than fifteen days prior <br /> Specific Standards: <br /> Waste Disposal 5.3.2(B)(1) <br /> 16 Method and adequacy of provision See original SUP <br /> for sewage disposal facilities, solid <br /> waste and water service. <br /> Safety 5.3.2(B)(2) <br /> 17. Method and adequacy of police, fire See original SUP <br /> and rescuesquad protection. <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.