Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />PROPOSAL FORMS Proposal - 2 <br />SINGLE PRIME CONTRACT: <br /> Whitted Health and Dental Clinics <br />BASE BID: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 1- Owner Preferred Manufacturer: Door Hardware <br /> <br />Amount: Dollars ($ ) <br /> <br /> Southern Human Service Health Department <br />BASE BID: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 1- Owner Preferred Manufacturer: Door Hardware <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br /> <br />MAJOR SUBCONTRACTORS if any (Name, City & State) <br /> <br />General Subcontractor: Paint Subcontractor: <br /> <br /> Lic Lic <br /> <br />Flooring Subcontractor: <br /> <br /> Lic <br /> <br /> <br />GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is <br />accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, excep t (i) if the listed <br />subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br />contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause sho wn by the contractor. <br /> <br /> <br /> <br /> <br />ALLOWANCES - (Refer to Division 01 Section 01 21 00 – Allowances for amounts to be included in bid shall <br />be based on the Unit Prices provided as part of Section 01 22 00 ) Acknowledge Allowances have been included with <br />in the Base Bid. <br />UP/A-1______________ A-2 ______________ A-3_______________ <br /> <br /> <br />UNIT PRICES - (Refer to Division 01 Section 01 22 00 - Unit Prices for Quantities) <br />Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically <br />noted. Unit prices shall be applied, as appropriate, to compute the total value of changes in the base bid quantity of <br />the work and in the given Allowances all in accordance with the contract documents. <br /> <br />Unit Price No. UP/A-1; Moisture Remediation Primer. – 750 sf Unit Price ($) <br /> <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.