Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />RESILIENT BASE AND ACCESSORIES 09 65 13 - 5 <br />3.5 CLEANING AND PROTECTION <br />A. Comply with manufacturer’s written instructions for cleaning and protection of resilient products. <br />B. Perform the following operations immediately after completing resilient product installation: <br />1. Remove adhesive and other blemishes from exposed surfaces. <br />2. Sweep and vacuum surfaces thoroughly. <br />3. Damp-mop surfaces to remove marks and soil. <br />C. Protect resilient products from mars, marks, indentations, and other damage from construction operations <br />and placement of equipment and fixtures during remainder of construction period. <br />1. Apply protective floor polish to resilient accessories that are free from soil, visible adhesive, and <br />surface blemishes. <br />2. Coordinate selection of floor polish with Owner’s maintenance service. <br />3. Cover resilient accessories on floors and stairs with undyed, untreated building paper until <br />inspection for Final Acceptance. <br />D. Floor Polish: Remove soil, visible adhesive, and surface blemishes from resilient stair treads before <br />applying liquid floor polish. <br />1. Apply three coat(s). <br />E. Cover resilient products until Substantial Completion. <br />F. Clean products specified in this Section not more than 4 days prior to dates scheduled for inspections <br />intended to establish date of Final Acceptance in each area of Project. Clean products using method <br />recommended by manufacturer. <br />1. Strip protective floor polish that was applied after completing installation, prior to cleaning. <br />2. Reapply floor polish after cleaning. <br />END OF SECTION 09 65 13 <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.