Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOOR HARDWARE 087100-6 <br />Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />2.Provide secure lock-up for door hardware delivered to Project. Control handling and installation <br />of hardware items so that completion of Work will not be delayed by hardware losses both before <br />and after installation. <br />D.Protection and Damage: <br />1.Promptly replace products damaged during shipping. <br />2.Handle hardware in manner to avoid damage, marring, or scratching. Correct, replace or repair <br />products damaged during Work. <br />3.Protect products against malfunction due to paint, solvent, cleanser, or any chemical agent. <br />E.Deliver keys to Owner by registered mail or overnight package service. <br />1.07 COORDINATION <br />A.Installation Templates: Distribute for doors, frames, and other work specified to be factory or shop <br />prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for <br />locating and installing door hardware to comply with indicated requirements. <br />B.Security: Coordinate installation of door hardware, keying, and access control with Owner’s security <br />consultant. <br />C.Electrical System Roughing-In: Coordinate layout and installation of electrified door hardware with <br />connections to power supplies and building safety and security systems. <br />D.Existing Openings: Where existing doors, frames and/or hardware are to remain, field verify existing <br />functions, conditions and preparations and coordinate to suit opening conditions and to provide proper <br />door operation. <br />1.08 WARRANTY <br />A.Warranty: Manufacturer’s standard form in which manufacturer agrees to repair or replace <br />components of door hardware that fail in materials or workmanship within specified warranty period. <br />1.Warranty Period: Beginning from date of Substantial Completion, for durations indicated. <br />a.Closers: <br />1)Mechanical: 30 years. <br />b.Automatic Operators: 2 years. <br />c.Key Blanks: Lifetime <br />2.Warranty does not cover damage or faulty operation due to improper installation, <br />improper use or abuse. <br />1.09 MAINTENANCE <br />A.Maintenance Tools: Furnish complete set of special tools required for maintenance and <br />adjustment of hardware, including changing of cylinders. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.