Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOOR HARDWARE 087100-5 <br />Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />C.Single Source Responsibility: Obtain each type of door hardware from single manufacturer. <br />D.Electrified Door Hardware: Listed and labeled as defined in NFPA 70, Article 100, by testing agency <br />acceptable to authorities having jurisdiction. <br />E.Accessibility Requirements: For door hardware on doors in an accessible route, comply with <br />governing accessibility regulations cited in REFERENCES article, herein. <br />F.Keying Conference <br />1.Incorporate keying conference decisions into final keying schedule after reviewing door <br />hardware keying system including: <br />a.Function of building, flow of traffic, purpose of each area, degree of security required, and <br />plans for future expansion. <br />b.Preliminary key system schematic diagram. <br />c.Requirements for access control. <br />d.Address for delivery of keys. <br />G.Pre-installation Conference <br />1.Review and finalize construction schedule and verify availability of materials, Installer’s <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />2.Inspect and discuss preparatory work performed by other trades. <br />3.Inspect and discuss electrical roughing-in for electrified door hardware. <br />4.Review sequence of operation for each type of electrified door hardware. <br />5.Review required testing, inspecting, and certifying procedures. <br />H.Coordination Conferences: <br />1.Installation Coordination Conference: Prior to hardware installation, schedule and hold meeting <br />to review questions or concerns related to proper installation and adjustment of door hardware. <br />2.Electrified Hardware Coordination Conference: Prior to ordering electrified hardware, <br />schedule and hold meeting to coordinate door hardware with security, electrical, doors and <br />frames, and other related suppliers. <br />1.06 DELIVERY, STORAGE, AND HANDLING <br />A.Inventory door hardware on receipt and provide secure lock-up for hardware delivered to Project <br />site. <br />B.Tag each item or package separately with identification coordinated with final door hardware <br />schedule, and include installation instructions, templates, and necessary fasteners with each item or <br />package. <br />1.Deliver each article of hardware in manufacturers original packaging. <br />C.Project Conditions: <br />1.Maintain manufacturer-recommended environmental conditions throughout storage and <br />installation periods. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.