Orange County NC Website
DOOR HARDWARE 087100-3 <br />Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />4.Door Hardware Schedule: Submit schedule with hardware sets in vertical format as illustrated <br />by Sequence of Format for the Hardware Schedule as published by the Door and Hardware <br />Institute. Indicate complete designations of each item required for each door or opening, <br />include: <br />a.Door Index; include door number, heading number, and Architects hardware set <br />number. <br />b.Opening Lock Function Spreadsheet: List locking device and function for each <br />opening. <br />c.Quantity, type, style, function, size, and finish of each hardware item. <br />d.Name and manufacturer of each item. <br />e.Fastenings and other pertinent information. <br />f.Location of each hardware set cross-referenced to indications on Drawings. <br />g.Explanation of all abbreviations, symbols, and codes contained in schedule. <br />h.Mounting locations for hardware. <br />i.Door and frame sizes and materials. <br />j.Name and phone number for local manufacturer’s representative for each product. <br />k.Operational Description of openings with any electrified hardware (locks, exits, <br />electromagnetic locks, electric strikes, automatic operators, door position switches, <br />magnetic holders or closer/holder units, and access control components). Operational <br />description should include operational descriptions for: egress, ingress (access), and <br />fire/smoke alarm connections. <br />1)Submittal Sequence: Submit door hardware schedule concurrent with submissions of <br />Product Data, Samples, and Shop Drawings. Coordinate submission of door <br />hardware schedule with scheduling requirements of other work to facilitate <br />fabrication of other work that is critical in Project construction schedule. <br />5.Key Schedule: <br />a.After Keying Conference, provide keying schedule listing levels of keying as well as <br />explanation of key system’s function, key symbols used and door numbers controlled. <br />b.Use ANSI/BHMA A156.28 Recommended Practices for Keying Systems as guideline <br />for nomenclature, definitions, and approach for selecting optimal keying system. <br />c.Provide 3 copies of keying schedule for review prepared and detailed in accordance with <br />referenced DHI publication. Include schematic keying diagram and index each key to <br />unique door designations. <br />d.Index keying schedule by door number, keyset, hardware heading number, cross keying <br />instructions, and special key stamping instructions. <br />e.Provide one complete bitting list of key cuts and one key system schematic <br />illustrating system usage and expansion. <br />1)Forward bitting list, key cuts and key system schematic directly to Owner, by means <br />as directed by Owner. <br />f.Prepare key schedule by or under supervision of supplier, detailing Owners final keying <br />instructions for locks. <br />6.Templates: After final approval of hardware schedule, provide templates for doors, frames <br />and other work specified to be factory or shop prepared for door hardware installation. <br />C.Informational Submittals: <br />1.Qualification Data: For Supplier, Installer and Architectural Hardware Consultant. <br />2.Product data for electrified door hardware: <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1