Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOOR HARDWARE 087100-3 <br />Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />4.Door Hardware Schedule: Submit schedule with hardware sets in vertical format as illustrated <br />by Sequence of Format for the Hardware Schedule as published by the Door and Hardware <br />Institute. Indicate complete designations of each item required for each door or opening, <br />include: <br />a.Door Index; include door number, heading number, and Architects hardware set <br />number. <br />b.Opening Lock Function Spreadsheet: List locking device and function for each <br />opening. <br />c.Quantity, type, style, function, size, and finish of each hardware item. <br />d.Name and manufacturer of each item. <br />e.Fastenings and other pertinent information. <br />f.Location of each hardware set cross-referenced to indications on Drawings. <br />g.Explanation of all abbreviations, symbols, and codes contained in schedule. <br />h.Mounting locations for hardware. <br />i.Door and frame sizes and materials. <br />j.Name and phone number for local manufacturer’s representative for each product. <br />k.Operational Description of openings with any electrified hardware (locks, exits, <br />electromagnetic locks, electric strikes, automatic operators, door position switches, <br />magnetic holders or closer/holder units, and access control components). Operational <br />description should include operational descriptions for: egress, ingress (access), and <br />fire/smoke alarm connections. <br />1)Submittal Sequence: Submit door hardware schedule concurrent with submissions of <br />Product Data, Samples, and Shop Drawings. Coordinate submission of door <br />hardware schedule with scheduling requirements of other work to facilitate <br />fabrication of other work that is critical in Project construction schedule. <br />5.Key Schedule: <br />a.After Keying Conference, provide keying schedule listing levels of keying as well as <br />explanation of key system’s function, key symbols used and door numbers controlled. <br />b.Use ANSI/BHMA A156.28 Recommended Practices for Keying Systems as guideline <br />for nomenclature, definitions, and approach for selecting optimal keying system. <br />c.Provide 3 copies of keying schedule for review prepared and detailed in accordance with <br />referenced DHI publication. Include schematic keying diagram and index each key to <br />unique door designations. <br />d.Index keying schedule by door number, keyset, hardware heading number, cross keying <br />instructions, and special key stamping instructions. <br />e.Provide one complete bitting list of key cuts and one key system schematic <br />illustrating system usage and expansion. <br />1)Forward bitting list, key cuts and key system schematic directly to Owner, by means <br />as directed by Owner. <br />f.Prepare key schedule by or under supervision of supplier, detailing Owners final keying <br />instructions for locks. <br />6.Templates: After final approval of hardware schedule, provide templates for doors, frames <br />and other work specified to be factory or shop prepared for door hardware installation. <br />C.Informational Submittals: <br />1.Qualification Data: For Supplier, Installer and Architectural Hardware Consultant. <br />2.Product data for electrified door hardware: <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.