Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOOR HARDWARE 087100-2 <br />Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />1.03 REFERENCES <br />A.UL - Underwriters Laboratories <br />1.UL 10B - Fire Test of Door Assemblies <br />2.UL 10C - Positive Pressure Test of Fire Door Assemblies <br />3.UL 1784 - Air Leakage Tests of Door Assemblies <br />B.DHI - Door and Hardware Institute <br />1.Sequence and Format for the Hardware Schedule <br />2.Recommended Locations for Builders Hardware <br />3.Key Systems and Nomenclature <br />C.ANSI - American National Standards Institute <br />1.ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware and <br />Specialties <br />1.04 SUBMITTALS <br />A.General: <br />1.Submit in accordance with Conditions of Contract and Division 01 requirements. <br />2.Highlight, encircle, or otherwise specifically identify on submittals deviations from Contract <br />Documents, issues of incompatibility or other issues which may detrimentally affect the Work. <br />3.Prior to forwarding submittal, comply with procedures for verifying existing door and frame <br />compatibility for new hardware, as specified in PART 3, EXAMINATION article, herein. <br />B.Action Submittals: <br />1.Product Data: Technical product data for each item of door hardware, installation instructions, <br />maintenance of operating parts and finish, and other information necessary to show compliance <br />with requirements. <br />2.Riser and Wiring Diagrams: After final approval of hardware schedule, submit details of <br />electrified door hardware, indicating: <br />a.Wiring Diagrams: For power, signal, and control wiring and including: <br />1)Details of interface of electrified door hardware and building safety and security <br />systems. <br />2)Schematic diagram of systems that interface with electrified door hardware. <br />3)Point-to-point wiring. <br />4)Risers. <br />3.Samples for Verification: If requested by Architect, submit production sample of requested <br />door hardware unit in finish indicated, and tagged with full description for coordination <br />with schedule. <br />a.Samples will be returned to supplier. Units that are acceptable to Architect may, after final <br />check of operations, be incorporated into Work, within limitations of key coordination <br />requirements. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.