Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 4 <br />3.4 SELECTIVE DEMOLITION, GENERAL <br />A. General: Demolish and remove existing construction only to the extent required by new construction and <br />as indicated. Use methods required to complete the Work within limitations of governing regulations and <br />as follows: <br />3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS <br />A. Concrete: Demolish in small sections. Cut concrete to a depth of at least 3/4 inch at junctures with <br />construction to remain, using power-driven saw. Dislodge concrete from reinforcement at perimeter of <br />areas being demolished, cut reinforcement, and then remove remainder of concrete indicated for selective <br />demolition. Neatly trim openings to dimensions indicated. <br />B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at <br />regular intervals, using power-driven saw, then remove concrete between saw cuts. <br />3.6 DISPOSAL OF DEMOLISHED MATERIALS <br />A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated <br />to remain Owner’s property, remove demolished materials from Project site and legally dispose of them in <br />an EPA-approved landfill. <br />1. Do not allow demolished materials to accumulate on-site. <br />2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. <br />3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey <br />debris to grade level in a controlled descent. <br />B. Burning: Do not burn demolished materials. <br />C. Disposal: Transport demolished materials off Owner’s property and legally dispose of them. <br />3.7 CLEANING <br />A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition <br />operations. Return adjacent areas to condition existing before selective demolition operations began. <br />END OF SECTION 02 41 19 <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.