Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />OPERATION AND MAINTENANCE DATA 01 78 23 - 4 <br />5. Special operating instructions and procedures. <br />2.4 OPERATION MANUALS <br />A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections <br />and the following information: <br />1. System, subsystem, and equipment descriptions. <br />2. Performance and design criteria if Contractor is delegated design responsibility. <br />3. Operating standards. <br />4. Operating procedures. <br />5. Operating logs. <br />6. Wiring diagrams. <br />7. Control diagrams. <br />8. Piped system diagrams. <br />9. Precautions against improper use. <br />10. License requirements including inspection and renewal dates. <br />B. Descriptions: Include the following: <br />1. Product name and model number. <br />2. Manufacturer’s name. <br />3. Equipment identification with serial number of each component. <br />4. Equipment function. <br />5. Operating characteristics. <br />6. Limiting conditions. <br />7. Performance curves. <br />8. Engineering data and tests. <br />9. Complete nomenclature and number of replacement parts. <br />C. Operating Procedures: Include the following, as applicable: <br />1. Startup procedures. <br />2. Equipment or system break-in procedures. <br />3. Routine and normal operating instructions. <br />4. Regulation and control procedures. <br />5. Instructions on stopping. <br />6. Normal shutdown instructions. <br />7. Seasonal and weekend operating instructions. <br />8. Required sequences for electric or electronic systems. <br />9. Special operating instructions and procedures. <br />D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed. <br />E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification. <br />2.5 PRODUCT MAINTENANCE MANUAL <br />A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, <br />product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described <br />below. <br />B. Source Information: List each product included in manual identified by product name and arranged to match manual’s <br />table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance <br />service agent, and cross-reference Specification Section number and title in Project Manual. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.