Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3 <br />PART 3 - EXECUTION <br />3.1 INSTALLATION, GENERAL <br />A. Locate facilities where they will serve Project adequately and result in minimum interference with performance <br />of the Work. Relocate and modify facilities as required by progress of the Work. <br />B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer <br />needed or are replaced by authorized use of completed permanent facilities. <br />3.2 TEMPORARY UTILITY INSTALLATION <br />A. General: Install temporary service or connect to existing service. <br />1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if <br />necessary, to make connections for temporary services. <br />B. Water Service: Use of Owner’s existing water service facilities will be permitted, as long as facilities are <br />cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities <br />to condition existing before initial use. <br />1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan of <br />suitable size to minimize water damage. Drain accumulated water promptly from pans. <br />C. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction <br />personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance <br />of fixtures and facilities. <br />1. Use of Owner’s existing toilet facilities will be not be permitted <br />D. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or <br />drying of completed installations or for protecting installed construction from adverse effects of low <br />temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations <br />or elements being installed. <br />E. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing <br />or drying of completed installations or for protecting installed construction from adverse effects of high <br />humidity. Select equipment that will not have a harmful effect on completed installations or elements being <br />installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy <br />consumption. <br />F. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and <br />power characteristics required for construction operations. <br />1. Use of building power during renovations is Permitted. <br />Connect temporary service to Owner’s existing power source, as directed by Owner. <br />G. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction <br />operations, observations, inspections, and traffic conditions. <br />1. Install and operate temporary lighting that fulfills security and protection requirements without <br />operating entire system. <br />2. Install lighting for Project identification sign. <br />H. Provide superintendent with cellular telephone or portable two-way radio for use when away from field office. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.