Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2 <br />1.6 QUALITY ASSURANCE <br />A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric <br />service. Install service to comply with NFPA 70. <br />B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility <br />before use. Obtain required certifications and permits. <br />1.7 PROJECT CONDITIONS <br />A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for <br />operation, maintenance, and protection of each permanent service during its use as a construction facility <br />before Owner’s acceptance, regardless of previously assigned responsibilities. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />2.2 TEMPORARY FACILITIES <br />A. Field Offices, General:. Not required. Owner will advise location for monthly meetings <br />B. Temporary Storage: Temporary storage will be required for owner furnishings and equipment to be stored by <br />the contractor during construction. Should there be no available storage area within the facility being <br />renovated, the contractor will provide semi-conditioned temporary storage at its expense for as long as work <br />persists. On-site containers are to be coordinated with the owner and users to avoid disruption of daily <br />operation. <br />2.3 EQUIPMENT <br />A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes <br />of fire exposures. <br />B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, self-contained, <br />liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. <br />1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is <br />prohibited. <br />2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to <br />authorities having jurisdiction, and marked for intended use. <br />3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use <br />during construction, provide filter with MERV of 8 at each return air grille in system and remove at end <br />of construction. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.