Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1 <br />SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes requirements for temporary utilities, support facilities, and security and protection <br />facilities. <br />B. Related Sections include the following: <br />1. Division 01 Section "Summary" for limitations on utility interruptions and other work restrictions. <br />2. Division 01 Section "Submittal Procedures" for procedures for submitting copies of implementation <br />and termination schedule and utility reports. <br />1.3 DEFINITIONS <br />A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete, insulated, and <br />weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent <br />construction or substantial temporary closures. <br />1.4 USE CHARGES <br />A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. Allow other <br />entities to use temporary services and facilities without cost, including, but not limited to, Owner’s construction <br />forces, Architect, occupants of Project, testing agencies, and authorities having jurisdiction. <br />B. Water Service: CONTRACTOR WILL pay all water service connection expenses or charges for water used by <br />all entities for construction operations. CONTRACTOR WILL pay for actual water use charges until <br />Substantial Completion. <br />C. Electric Power Service: CONTRACTOR WILL pay all electric power service use charges for electricity used <br />by all entities for construction operations. CONTRACTOR WILL pay for actual electrical use charges until <br />Substantial Completion. <br />1.5 SUBMITTALS <br />A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction <br />personnel. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.