Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />QUALITY REQUIREMENTS 01 40 00 - 4 <br />2. NVLAP: A testing agency accredited according to NIST’s National Voluntary Laboratory Accreditation <br />Program. <br />H. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is <br />trained and approved by manufacturer to inspect installation of manufacturer’s products that are similar in <br />material, design, and extent to those indicated for this Project. <br />I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance <br />with specified requirements for performance and test methods, comply with the following: <br />1. Contractor responsibilities include the following: <br />a. Provide test specimens representative of proposed products and construction. <br />b. Submit specimens in a timely manner with sufficient time for testing and analyzing results to <br />prevent delaying the Work. <br />c. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to <br />adequately demonstrate capability of products to comply with performance requirements. <br />d. Build site-assembled test assemblies and mockups using installers who will perform same tasks <br />for Project. <br />e. Build laboratory mockups at testing facility using personnel, products, and methods of <br />construction indicated for the completed Work. <br />f. When testing is complete, remove test specimens, assemblies, mockups, and laboratory mockups; <br />do not reuse products on Project. <br />2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar <br />quality-assurance service to Architect, with copy to Contractor. Interpret tests and inspections and state in <br />each report whether tested and inspected work complies with or deviates from the Contract Documents. <br />1.7 QUALITY CONTROL <br />A. Owner Responsibilities: Where quality-control services are indicated as Owner’s responsibility, Owner will <br />engage a qualified testing agency to perform these services. <br />1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged <br />and a description of types of testing and inspecting they are engaged to perform. <br />2. Payment for these services will be made from testing and inspecting allowances, as authorized by Change <br />Orders. <br />3. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to <br />comply with the Contract Documents will be charged to Contractor. <br />B. Tests and inspections not explicitly assigned to Owner are Contractor’s responsibility. Unless otherwise <br />indicated, provide quality-control services specified and those required by authorities having jurisdiction. <br />Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or <br />not. Cost for these services are included in the Contract Sum <br />1. Where services are indicated as Contractor’s responsibility, engage a qualified testing agency to perform <br />these quality-control services. <br />a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner. <br />2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting <br />will be performed. <br />3. Where quality-control services are indicated as Contractor’s responsibility, submit a certified written <br />report, in duplicate, of each quality-control service. <br />4. Testing and inspecting requested by Contractor and not required by the Contract Documents are <br />Contractor’s responsibility. <br />5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so <br />direct. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.