Browse
Search
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-232-E-AMS-Harrod and Assoc. Constructors-OC Health Department Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:22:28 AM
Creation date
6/4/2025 8:17:02 AM
Metadata
Fields
Template:
Contract
Date
5/23/2025
Contract Starting Date
5/23/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$457,200.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 5 <br />4. Use "one workday" as the unit of time. Include list of nonworking days and holidays incorporated into the <br />schedule. <br />C. Cost Loaded CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the <br />preliminary network diagram, prepare a skeleton network to identify probable critical paths. <br />1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in <br />relation to other activities. Include estimated time frames for the following activities: <br />a. Preparation and processing of submittals. <br />b. Mobilization and demobilization. <br />c. Purchase of materials. <br />d. Delivery. <br />e. Fabrication. <br />f. Utility interruptions. <br />g. Installation. <br />h. Work by Owner that may affect or be affected by Contractor’s activities. <br />i. Testing. <br />2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. <br />Scheduled start and completion dates shall be consistent with Contract milestone dates. <br />3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, <br />reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the <br />limitations of the Contract Time. <br />4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float <br />near the edges. <br />a. Subnetworks on separate sheets are permissible for activities clearly off the critical path. <br />D. Initial Issue of Schedule: Prepare initial network diagram from a list of straight "early start-total float" sort. Identify <br />critical activities. Prepare tabulated reports showing the following: <br />1. Contractor or subcontractor and the Work or activity. <br />2. Description of activity. <br />3. Principal events of activity. <br />4. Immediate preceding and succeeding activities. <br />5. Early and late start dates. <br />6. Early and late finish dates. <br />7. Activity duration in workdays. <br />8. Total float or slack time. <br />9. Average size of workforce. <br />10. Dollar value of activity (coordinated with the Schedule of Values). <br />E. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following: <br />1. Identification of activities that have changed. <br />2. Changes in early and late start dates. <br />3. Changes in early and late finish dates. <br />4. Changes in activity durations in workdays. <br />5. Changes in the critical path. <br />6. Changes in total float or slack time. <br />7. Changes in the Contract Time. <br />F. Value Summaries: Prepare two cumulative value lists, sorted by finish dates. <br />1. In first list, tabulate activity number, early finish date, dollar value, and cumulative dollar value. <br />2. In second list, tabulate activity number, late finish date, dollar value, and cumulative dollar value. <br />3. In subsequent issues of both lists, substitute actual finish dates for activities completed as of list date. <br />4. Prepare list for ease of comparison with payment requests; coordinate timing with progress meetings. <br />a. In both value summary lists, tabulate "actual percent complete" and "cumulative value completed" <br />with total at bottom. <br />b. Submit value summary printouts before each regularly scheduled progress meeting. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1
The URL can be used to link to this page
Your browser does not support the video tag.