Orange County NC Website
Orange County Health Department Improvements Smith Sinnett / 2024008 <br />Hillsborough, NC Orange County Asset Management Services <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 3 <br />8. Review procedures for updating schedule. <br />1.6 COORDINATION <br />A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with <br />scheduling and reporting of separate contractors. <br />B. Coordinate Contractor’s Cost Loaded Construction Schedule and develop it into a Schedule of Values. Coordinate with <br />schedule a list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules <br />and reports. <br />1. Secure time commitments for performing critical elements of the Work from parties involved. <br />2. Coordinate each construction activity in the network with other activities and schedule them in proper <br />sequence. <br />PART 2 - PRODUCTS <br />2.1 SUBMITTALS SCHEDULE <br />A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction <br />schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when <br />establishing dates. <br />1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor’s <br />Construction Schedule. <br />2. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include submittals required <br />during the first 60 days of construction. List those required to maintain orderly progress of the Work and those <br />required early because of long lead time for manufacture or fabrication. <br />a. At Contractor’s option, show submittals on the Preliminary Construction Schedule, instead of <br />tabulating them separately. <br />3. Final Submittal: Submit concurrently with the first complete submittal of Contractor’s Construction Schedule. <br />2.2 CONTRACTOR’S CONSTRUCTION SCHEDULE, GENERAL <br />A. Procedures: Comply with procedures contained in AGC’s "Construction Planning & Scheduling." <br />B. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion. <br />1. Contract completion date shall not be changed by submission of a schedule that shows an early completion <br />date, unless specifically authorized by Change Order. <br />C. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. <br />Comply with the following: <br />1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by <br />Architect. <br />2. Submittal Review Time: Include review and resubmittal times indicated in Division 01 Section "Submittal <br />Procedures" in schedule. Coordinate submittal review times in Contractor’s Construction Schedule with <br />Submittals Schedule. <br />3. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and <br />allow time for Architect’s administrative procedures necessary for certification of Substantial Completion. <br />D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, <br />and show how the sequence of the Work is affected. <br />1. Phasing: Arrange list of activities on schedule by phase. <br />2. Work by Owner: Include a separate activity for each portion of the Work performed by Owner. <br />Docusign Envelope ID: 186E0FF8-664C-4A5C-9F97-28196CE69FD1