Browse
Search
2025-231-E-AMS-Jacobs Glass Company-Install Door at the Visitor's Bureau
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-231-E-AMS-Jacobs Glass Company-Install Door at the Visitor's Bureau
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2025 8:16:38 AM
Creation date
6/4/2025 8:16:33 AM
Metadata
Fields
Template:
Contract
Date
5/21/2025
Contract Starting Date
5/21/2025
Contract Ending Date
6/2/2025
Contract Document Type
Contract
Amount
$10,116.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> <br />JACOBS GLASS COMPANY <br />4915 HILLSBOROUGH RD. <br />DURHAM, N.C. 27705 <br />PHONE 919-383-1120 FAX 919-309-4350 <br /> <br />QUOTE #: 2025-699 <br /> <br />ATTENTION: Kate Prysock <br />EMAIL: kprysockt@orangecountync.gov <br />DATE: May 7, 2025 <br />JOB NAME: Orange Chapel Hill Welcome Center <br />LOCATION: 308 W Franklin St. Chapel Hill <br /> <br />WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: <br /> <br />Mooney Bldg <br />- (1) Automatic LCN 4642 push side door (INTERIOR SIDE OF DOOR) <br />- (2) 433 mhz receivers <br />- (1) 4 ½” actuator button with text <br />- (1) Bollard Post to be mounted on brick paver <br />- (2) surface mounted actuator housing <br />- (2) wireless transmitters <br /> <br /> <br />EXCLUSIONS: <br />- High voltage wiring is excluded <br />- After hours / weekend work <br />- Moving of signage (if needed) and/or motion sensors is excluded and to be by others <br />- Integration of locksets with automatic operator is excluded and to be by others (access <br />control). <br />- Brick pavers need to be strong enough to accept anchors for bollard post mounting. If <br />reinforcement is needed for bricks, this will be excluded per this quote. <br /> <br />NOTES: <br />- Material lead times are 4-5 weeks currently <br /> <br />PRICE FOR INSTALL OF AUTOMATIC OPERATOR WITH BOLLARD POST <br />WE PROPOSE HEREBY TO FURNISH MATERIAL AND LABOR – COMPLETE IN ACCORDANCE WITH ABOVE <br />SPECIFICATIONS, FOR THE SUM OF MATERIALS AND LABOR: $ 9,409.77 <br /> TAX: $ 705.73 <br /> <br /> TOTAL: $ 10,115.50 <br /> <br /> <br />THIS PROPOSAL IS VALID FOR 20 DAYS FROM THE DATE PRINTED ON FORM ABOVE <br />NOTE: ALL CREDIT CARD TRANSACTIONS ARE SUBJECT TO 3 % PROCESSING FEE. <br />NOTE: If Executed E- 589 CI is provided Labor Tax Will Be Removed at point of invoice. <br />AUTHORIZED SIGNATURE: Glenn Sykes <br /> Glenn Sykes <br />NOTE: WE MAY WITHDRAWL THIS PROPOSAL IF NOT ACCEPTED WITHIN 20 DAYS. <br /> <br />Docusign Envelope ID: 02C4068C-67C7-4DC3-B691-D67D7C2A0973
The URL can be used to link to this page
Your browser does not support the video tag.