Orange County NC Website
Revised 01/24 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 4/23/25 Project: Outside Plant Fiber Infrastructure Change Order No. 8 Department: IT Department Address: 131 W <br />Margaret Lane Project: Contractor: Netplanner Systems Inc Contractor Address: 1229 Perry Rd ste 108 Apex NC 27502 <br /> Effective date of original contract: 3March2021 (2021-160) <br /> <br />This change order increases decreases the contract time by days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial completion is: <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: To alter the OSP fiber from going underground to Aerial Fiber. • Provide and install (1) 144ct and 24ct aerial fiber for the <br />Orange County Detention Center to the Orange County Health Department and then to the Orange County West Campus Office building. The 144ct fiber <br />will be the main feeder cable and the 24ct fiber is the lateral going in each building. • Provide and install (1) ¼” messenger strand on Duke approved <br />poles from the Detention Center to the Health Dep. and from the Health Dep. to the West Campus Office Bldg. per Duke specifications. • Provide and <br />install Down Guy anchors per Duke specs and yellow guy guards. • Provide and install (1) 144ct Single-mode Lite Armored fiber from the Detention <br />Center Riser Pole next to the entrance lashing the fiber to the strand to the Health Dep. Splice Location at the intersection of W King St and N Hassel St. <br />PCT will then continue lashing up the 144ct fiber from the Health Dep. to the West Campus bldg. • Provide and install (1) 24ct Single-mode Lite Armored <br />fiber into each building for terminations. • Provide and install Corning 1U Fiber Enclosures in each building to house terminations. • Provide and install <br />(6) Snow-show slack locations along route for storage in case of damages. Each slack location will store 150’ of slack. • utilize the existing UG pathways <br />to get access into the Detention Center and the West Campus Office building. A new building entrance will be added at the Health Dep. • splice all fiber <br />at building locations per the original plans spec for the original project. • test all fiber bi-directional with an OTDR and provide the customer wit test <br />results at the completion of the project. The path of the fiber installation will follow as shown in the AERIAL FIBER MAP (attachment A) and be <br />performed for $219,209.25. <br /> <br />Reason for Change: Change from in-ground to above-ground <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 307,070.14 <br /> <br />Contract sum prior to this change order: $ 415,128.65 <br /> <br />Amount of this change order: $ (30,285.79) <br /> <br />Total sum of the contract including this change order: $ 384,842.86 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, project, services, or <br />work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 22nd day of May, 2025. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br /> <br />By:____________________________ By:___________________________ By:___________________________ <br /> <br /> <br />Docusign Envelope ID: 7893C816-32D1-411B-8128-E27E69DB4E85 <br />5/22/20255/22/2025 6/1/2025