Browse
Search
PB Agenda Packet - June 4 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - June 4 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 4:35:25 PM
Creation date
5/30/2025 4:31:48 PM
Metadata
Fields
Template:
BOCC
Date
6/4/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> 825 to provide? A site map or a site plan?Like you have elevation,the site plan and site plan <br /> 826 application meeting, so you say you want elevations, and you want a map, and you want a site <br /> 827 plan, but you don't say what you want with all utilities at a facility site shall be installed <br /> 828 underground. Do you want a map of where the facility's installed? <br /> 829 <br /> 830 Cy Stober: That's a requirement of 2.5,which is not in the packet. All private utilities must be provided on a <br /> 831 site plan. That's sealed and delivered to the county. So, that is not proposed for amendment. <br /> 832 That's just identifying that all electrical and, in this case,fiber and should there be any other <br /> 833 utilities, such as gas,on site, they'd have to be shown on the site plan,whether they are public or <br /> 834 private. So, if there's an OWASA sewer line going through there, it must be underground. There <br /> 835 cannot be any aerials and no above-ground utilities are permitted on the site. <br /> 836 <br /> 837 Charity Kirk: Well, you've stated with 1, 2, 1, 3 and 4 exactly what you want,which is an elevation, 3 is a map,4 <br /> 838 is a site plan, 5 is a landscape plan, but 2 is just a statement. So, you might say,for consistency's <br /> 839 sake, how you want that to be given to you. <br /> 840 <br /> 841 Albert Benshoff: We need to check the site plan section,which is not before you tonight. <br /> 842 <br /> 843 Beth Bronson: I think the plan is in Section 2.5. It is outlined. <br /> 844 <br /> 845 Charity Kirk: It's an inconsistent use of the bullets. <br /> 846 <br /> 847 Beth Bronson: But on top of E, it does say application meeting Section 2.5. So, you do have to refer to Section <br /> 848 2.5, in which case all utilities public or private must have an accompanying site plan that would <br /> 849 indicate where those utilities are underground. <br /> 850 <br /> 851 Charity Kirk: So,then why does 4 have a site plan of the wireless support structure showing all of the <br /> 852 following? <br /> 853 <br /> 854 Beth Bronson: Because it's above ground and not part of 2.5. <br /> 855 <br /> 856 Charity Kirk: No,that's not a part of 2.5. If you all are happy with it, I'm just saying it's inconsistent.That's the <br /> 857 only one of 1, 2, 3,4 and 5 that does not clarify what document format you want it to take. That's <br /> 858 all. <br /> 859 <br /> 860 Cy Stober: That's because those are different documents an elevation is a profile of what the tower would be <br /> 861 like. <br /> 862 <br /> 863 Charity Kirk: I know what elevation is. <br /> 864 <br /> 865 Cy Stober: That's separate from the site plan. A site plan is a two-dimensional drawing. The utility <br /> 866 requirement is a layer that is an additional standard for what utilities may be done on the site plan. <br /> 867 The map is a locational map. It doesn't have to be as precise as the site plan. It doesn't even <br /> 868 have to be scale. The site plan comment in Item 4 is identifying additional requirements of that <br /> 869 site plan. It is redundant with language in E, but the others are not the same drawings as the site <br /> 870 plan itself of the property and its boundaries. So, I think the utility comment is an additional layer <br /> 871 of regulation beyond our site plan regulations. I'm comfortable with it. <br /> 872 <br /> 873 Charity Kirk: You're comfortable with it. Okay. <br /> 874 <br /> 875 Statler Gilfillen: I have one question on this. When those plans are submitted,they have to be done by a licensed <br /> 876 engineer, right,or an architect? Okay. As an architect, those are pretty standard presentations. <br /> 877 You can argue about nit-picking which way and what, but if they're not clear,the inspector at the <br /> 878 other end is going to send them back to the engineer and they're going to get it done properly. <br /> 879 That's tradition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.