Orange County NC Website
77 <br /> also comply with Section 2.20 of the UDO and submit a Buffer Use Authorization <br /> Certificate (BAC) application for disturbances inside the regulated stream buffer. <br /> 2. Based on the submitted materials, the project isn't proposing a stream crossing. If the <br /> project proposes a crossing and/or is disturbing the stream channel a Pre-Authorization <br /> Construction Notification (PCN) application will need to be submitted to the United <br /> States Army Corps of Engineers (USACE) for the scope of work and a USACE <br /> Jurisdictional Determination (JD) must be forwarded to Orange County staff. <br /> 3. Based on the information provided and for the proposed/assumed limits of disturbance, <br /> the project will need a Land Disturbance Permit (LDP). If this project requires a LDP the <br /> applicant must adhere to Sections 2.18, 2.19, and 6.15 of the UDO. If the project does <br /> not require an LDP an Erosion and Sedimentation Control Plan Waiver will be needed <br /> for adherence to Section 6.15.6(C) of the UDO. Orange County strongly advises the <br /> applicant to submit an LDP upfront that accounts for the total projects including the <br /> roads and lots. <br /> Fire and Life Chris Pendergrass <br /> Safety Date: Staff: cpendergrass _orangecountync.gov <br /> 919-245-6125 <br /> Storage Facility notes: <br /> - Surface must support at least 75,OOOlbs <br /> - Gate shall be no less than 20 foot in width and be equipped with Knox gate switch if <br /> electric <br /> - Drive width to be no less than 20 foot in width not including width of any parking spots <br /> - If units are over 62,000 gross building area, a second access will be required <br /> - Grade shall not be greater than 10 percent <br /> - Overhead clearance to be no less than 13 '/2 feet <br /> - Turnarounds and turning radiuses to meet 120 foot hammerhead or 120 foot <br /> acceptable hammerhead as shown in Appendix D <br /> - Fire extinguishers to be mounted with no more than 75 foot travel distance apart <br /> David Genwright <br /> NCDOT Date: 12/3/24 Staff: digenwright(a)ncdot.gov <br /> 336-570-6833 <br /> Permitting: <br /> • Prior to performing work in NCDOT R/W, the applicant will need to obtain the following: <br /> o Approved NCDOT Driveway Permit for proposed connection to NC Highway 57. <br /> ■ $50 Driveway fee per every access <br /> • Trip Gen: <br /> o This development is expected to have a low traffic generation. No roadway <br /> improvements are expected from NCDOT <br /> Plans: <br /> o Prior to issuance of the above permit documents, the applicant will need to <br /> satisfactorily address the following comments: <br /> ■ The left driveway detail on page D-100 with the 30' radii is the detail <br /> closest to matching our standard. That detail will need to be the driveway <br /> entrance constructed. <br /> ■ 10X70 sight distance triangles will need to be drawn on the site and <br /> landscaping plans <br /> • Those triangles will need to be clear of vegetation and anything <br /> that may obstruct sight. <br /> o The applicant will need to further evaluate and verify that roadway geometry and <br /> proposed access location provides adequate sight distance per NCDOT and <br /> AASHTO requirements. <br />