Orange County NC Website
53 <br /> Compliance for Phase 1 allowing for the units to be rented/occupied. Required landscaping shall <br /> be installed per phase. <br /> 17. The applicant shall be required to maintain all required land use buffers, including those of <br /> preserved vegetation, in accordance with the requirements of the Orange County Unified <br /> Development Ordinance Section 6.8, Landscaping, Buffers, and Tree Protection. <br /> 18. Proposed driveway connections with NC-57 shall be paved with asphalt. <br /> 19. The parking and drive aisles shall be surfaced with Type 57 washed stone. <br /> 20. The Planning Director shall have the authority to review and approve minor changes to the <br /> approved plan, per Section 2.9.1(1), Alterations to an Approved Conditional District of the Orange <br /> County Unified Development Ordinance, specific to the location and arrangement of development <br /> within the limits of disturbance and the proposed "activity area". The "activity area" shall be <br /> defined as the edge of gravel as shown on the provided conditional zoning plan set. <br /> Review Milestones <br /> Application Submittal Date November 7, 2024 <br /> Development Advisory Committee December 5, 2024 <br /> DAC Review <br /> Neighborhood Information Meeting December 30, 2024 <br /> NIM <br /> Note: the DAC is a staff/agency committee, established in Section 1.9 of the Unified Development <br /> Ordinance. <br /> Courtesy Review <br /> Jurisdiction Date Sent Comments Received (Y/N) <br /> State Clearing House November 11, 2024 Yes <br /> Analysis <br /> Staff Analysis <br /> As required under Section 2.8.5 of the UDO, the Planning Director shall cause an analysis to be made <br /> of the application. In analyzing this request, the Planning Director offers a full analysis of the <br /> application's consistency with the adopted Orange County 2030 Comprehensive Plan. <br /> See the drafted Statement of Consistency (Attachment 6) in which the relevant Goals and Objectives of <br /> the Orange County 2030 Comprehensive Land Use Plan have been analyzed in full detail. <br /> 1. The application is complete in accordance with the requirements of the UDO. Staff review <br /> determined that the application is complete and all submitted materials are in compliance with the <br /> following applicable sections of the UDO: <br /> ■ Section 2.8, Zoning Atlas and Unified Development Ordinance Amendments <br /> ■ Section 2.9, Conditional Districts <br /> In accordance with Section 2.9.1(F), Approval and Conditions, the applicant has submitted <br /> conditions which are to be reviewed by the Board of County Commissioners for a determination <br /> as to whether such conditions will afford protection of the public health, safety, and general <br /> welfare. <br /> "Storage of Goods" are defined as Use #62 (P) in the Table of Permitted Uses and within Article <br /> 10, Definitions of the LIDO as: <br /> 8 <br />