Orange County NC Website
40 <br /> CONSTRUCTION SEQUENCING NOTES: <br /> 1. LANDSCAPE CONTRACTOR SHALL HAVE ALL UNDERGROUND UTILITIESAND PROPOSED PLANT SCHEDULE: <br /> POLE LOCATIONS LOCATED PRIOR TO INSTALLING PLANT MATERIAL <br /> z. CONTRACTOR SHALL COMPLY WITH SIZING AND GRADING STANDARDS OF THE LATEST 20'WIDE BUFFER PLANTING 10'WIDE BUFFER PLANTING PLAN ,wxTV PaEPwawpLeNT LIST PROMOE Sv oaANCEcouxtt PuxMNc owARTMwT. <br /> FDTTION aF THE"AMERICAN STANDARD.FOR NURSERY STOCKBY THE AMERICAN PLAN FOR NC HWY 57 FOR NORTHERN RESIDENTIAL BOUNDARY <br /> ASSOCIATION OF NURSERYMEN NAN). ,O <br /> TERIALIN CRITICAL ROOT ZONES DF s�nri. /TKRs wLI <br /> 3. CONTRACTOR SHALL NDE PAND NEW PLANT MA " x°' <br /> E%ISTING TREES TO BE SAVED AND, <br /> ON SITE: <br /> 4. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE,PLANTING OR MULCH SHALL BE 1R rvEM UIMu cN+OcrR APPROVED BUFFERS(AS SHOWN): <br /> SEEDED LAWN PER NOTES ON PUN. ;p nu*uxE xeaxroFas' p <br /> 5. CONTRACTOR SHALL AMEND ALL PROPOSED PLANT BEDS WITH ORGANIC SOIL AMENDMENT (VT �ono� x x xc xvry s� =ITR[Esaza1TRUN <br /> (COMPOST).RT LL BEDS TO A DEPTH OF 8',ADD Y'OF COMPOST AND ROTOTILL AGAIN. — ———— ———— <br /> REMOVE ALL EXISTING WEEDS.GRASS AND ROOTS Fssivix..R.—LIN <br /> CONTRACTOR6. SHALL RAKE SMOOTH ALL UwN AREAS REEIVING SEED,REMOVE ALL aE"ETM =T TRE,1111HRUM <br /> EXISTINGWEEDS,GRASS AND RCOTS —SYN—BEITYUNE.TOR—Nulsnxcxn-TEEANov .AnoN <br /> 7. ALL PLANTING SHALL BE INSTALLED WITH THE SPECIFIED DYER OF MULCH. NoaTHwxPROPwrvLIxETORETNN.I.IN. TNETaEEAxO TON <br /> * FOR PUNTING DETAILS SEE SHEET G-101. <br /> B. 107 LANDSCAPING BUFFER SHALL BE MET. <br /> P 5 <br /> E 033 3479] 994E <br /> a .a4 zs.3e'w <br /> 07' <br /> LEGEND \� � \ T14 <br /> CCI <br /> TREE LINE V A '"� d <br /> \ OO ma <br /> TREE PROTECTION AREA \\ \ <br /> PROPOSED <br /> LINE \ \ g a <br /> —SF — SILT FENCE <br /> —X—X-1— GATE <br /> EDGE OF PAVED ROAD <br /> CENTERLINE OF TRANSMISSION I-- <br /> PROPERTY LINE <br /> IGHTOF-WAvPRGPERavurvE \ e m <br /> EDGE OF RIGHE OF.wAY <br /> / 4 <br /> CENTERLINE OF EXITING DISTRIBUTION LINE \ <br /> Ox OHS— PROPOSED OVERHEAD ELECTRICAL <br /> EXISTING OVERHEADSTATIC LINE <br /> PROPOSED DRAINAGE CHANNEL WITH FLOW OIREDNON <br /> III I <br /> V 1 i R <br /> -IklHllIil-TlklHlllTlliiHIT BAFFLE <br /> DRAINAGE BOUNDARY <br /> M�� <br /> EXISTING CONTOURS 1.07 INTERVAL 'ICINITY NWP NOT TO SCALE W <br /> PROPOSED CONTOURS,1.07 INTERVAL <br /> v SILT PENCE OUTLET 8 //'P / i O� .may U <br /> N19'S1 0 EIX <br /> C Z <br /> 944.9w i' SITE / Q <br /> cLeAN-1 STONE \t\t44 ,✓J'V `C' z <br /> VI <br /> J y Q <br /> i;..;. <br /> EXISTING AND PROPOSED. <br /> ASPHALT rn�Eu� F 2 <br /> �t _8 ° — m s <br /> GRASS <br /> ABC STONE <br /> Nfi5°41'47.85'Vl � <br /> 132790 �� Y✓J � <br /> y" / LS-100 <br />