Orange County NC Website
24 <br /> C. Will the project involve a land application system for treatment of wastewater? <br /> ■ ❑Yes❑✓ No - If yes, describe <br /> F_ <br /> ■ Has an application for a non-discharge permit been submitted to the NC <br /> Department of Environmental Management or Orange County Department of <br /> Environmental Health?❑ Yes❑ No <br /> D. Is a septic tank systemproposed which has a design capacity of more than <br /> 3,000 gallons per day? <br /> ❑ Yes ❑✓ No - If yes, describe <br /> E. Does the activity involve sludge disposal? ❑ Yes Q✓ No <br /> ■ If ves, where is the source of the sludge? <br /> ■ Describe where and how the sludge is being disposed <br /> E: <br /> ■ Has a NPDES permit from the NC Division of Environmental Quality been issued? <br /> Yes F✓ No <br /> F. Water Usage <br /> ■ Estimated number of employees: 1 x 25 gallons per day (gpd) = 25 gpd <br /> ■ Estimated water use for climate control = 5 gpd <br /> ■ Process Water <br /> 25 % Consumed <br /> 0 % Discharged to septic system <br /> 0 % Discharged to surface (including storm sewers - Describe: <br /> 100 % Evaporated <br /> 0 % Reclaimed/reused <br /> 0 % Other <br /> = 100% <br /> ■ Water used for cooling, heating, etc., in association with production or manufacturing <br /> 0 % Reused <br /> 0 % Consumed <br /> 0 % Discharged - Describe: <br /> = 100% <br /> 0 gpd Total Water Usage <br /> ■ Describe source of water: <br /> Well <br /> Page 4 of 6 <br />