Browse
Search
2025-220-E-AMS-Siemens Industry-Passmore HVAC Controls CO 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-220-E-AMS-Siemens Industry-Passmore HVAC Controls CO 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:51:58 PM
Creation date
5/29/2025 1:51:54 PM
Metadata
Fields
Template:
Contract
Date
5/27/2025
Contract Starting Date
5/27/2025
Contract Ending Date
5/27/2025
Contract Document Type
Contract
Amount
$32,718.80
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br />ORANGE COUNTY <br />CHANGE ORDER REQUEST <br />NORTH CAROLINA <br />______________________________________________________________________________________________________________ <br />Date: 05/22/2025 Project: Passmore HVAC Controls Change Order No. 01 Department: AMS Department Address: <br />306 Revere Road, Hillsborough NC 27278 Project: Passmore HVAC Controls Contractor: Siemens Industry, Inc Contractor Address: <br />215 Southport Drive, Ste 900, Morrisville, NC 27560 Effective date of original contract: 06/20/2024 <br />This change order increases decreases the contract time by 132 days. Check here if no impact to contract time . <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial completion is: June 27, <br />2025 <br />_______________________________________________________________________________________________________________ <br />Full Description of Change: Demo the installed MS/TP wiring for existing Carrier RTU01, 02 and 08. Provide and install new Siemens PXC field panel for <br />monitoring and control per change proposal. <br />Reason for Change: The temperature sensors in the occupied spaces were only for the Carrier VVT controllers and not the RTU. According to the Carrier <br />representative, the RTU was being internally command via the Carrier i-Vu system which is no longer active or installed on the site. As such, the only way <br />to command the unit is via a local thermostat (like the other seven (7) RTUs for the site) or a BACnet integration card & an extensive PPCL sequence for a <br />two-stage cooling RHU. This change order is for hardwired points on the existing Carrier RTUs. <br />_______________________________________________________________________________________________________________ <br />Original contract sum: $ 195,663.00 <br />Contract sum prior to this change order: $ 196,663.00 <br />Amount of this change order: $ 32,718.80 <br />Total sum of the contract including this change order: $ 228,381.80 <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, project, services, or <br />work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 27th day of May, 2025. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br />By:____________________________ By:___________________________ By:___________________________ <br />Docusign Envelope ID: 5A712C73-3478-4F70-8870-3DA46BC3AE3D <br />Area Geneeral Manager <br />5/25/2025 5/27/2025 <br />County Manager
The URL can be used to link to this page
Your browser does not support the video tag.