Browse
Search
2025-218-E-AMS-Warren-Hay Mechanical Contractors-Southern Human Services Emergency Boiler Line Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-218-E-AMS-Warren-Hay Mechanical Contractors-Southern Human Services Emergency Boiler Line Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:47:43 PM
Creation date
5/29/2025 1:47:37 PM
Metadata
Fields
Template:
Contract
Date
5/21/2025
Contract Starting Date
5/21/2025
Contract Ending Date
5/27/2025
Contract Document Type
Contract
Amount
$55,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WARREN - HAY <br />Mechanical Contractors <br />P.O. Box 818 • Hillsborough, NC 27278 <br />(919-732-4362) office (919-732-8660) Facsimile <br />www.warren-hay.com State License #M109794(SC) 29739 (NC) <br /> <br /> <br />May 16, 2025 <br /> <br /> <br /> <br />Orange County public works <br /> <br />Re: Southern Human Services – Boiler line repair <br /> <br />BUDGET PROPOSAL <br /> <br /> We hereby submit specifications and estimates for: As noted: <br />• Provide labor, equipment and materials needed to uncover existing boiler lines <br />from main building to boiler house for removal of existing leaking lines. <br />• Provide labor, equipment, and materials needed to install new water lines <br />(polyethene) from main building connection to boiler room connection. <br />• Provide labor to remove section of sidewalk for excavation, removal, installation <br />and tamped back fill of ditch. <br /> <br />We budget hereby to furnish material and labor: $55,000.00 (used as not to exceed) <br />Payment to be made upon completion. <br /> <br /> <br />Acceptance: _______________________ <br /> <br />Date: _________________________________ <br /> <br />Exclusions / Clarifications: <br />• Utilities locating, and or repair if unmarked and damaged. <br />• Concrete, (the section removed to open ditch will be re poured) <br />• After hour, overtime premium labor, expedited shipment. <br />• Painting of any ductwork (by others). <br />• Permits and related fees. <br />• Fire alarm apparatus, tie in, devices. <br /> <br />Respectfully submitted by: Ron LaPann Commercial Division ron.lapann@warren-hay.com <br />FINAL SUBJECT TO PRICING AT TIME OF RELEASE DUE TO UNKNOWN SURCHARGES <br />Docusign Envelope ID: 608BE36A-BCBD-4CBE-B7B8-DC1784FD35F5
The URL can be used to link to this page
Your browser does not support the video tag.