Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 4 <br />Revised 12/24 <br />2.13. “Liquidated Damages”, as stated in the Contract Documents, is an amount reasonably estimated in <br />advance to cover the losses incurred by the Owner by reason of failure of the CMAR to complete <br />the Work within the time specified. <br />2.14. “Surety”, as used herein, shall mean the bonding company or corporate body which is bound with <br />and for the CMAR, and which engages to be responsible for the CMAR and its acceptable <br />performance of the Work. <br />2.15. “Request for Information” (RFI) is a request from the CMAR seeking an interpretation or <br />clarification by the Project Designer relative to the Contract Documents. The RFI, which shall be <br />labeled (RFI), shall clearly and concisely set forth the issue or item requiring clarification or <br />interpretation and why the response is needed. The RFI must set forth the CMAR’s interpretation <br />or understanding of the Contract Documents requirements in question, along with reasons for such <br />an understanding. <br />2.16. “Inspection” shall mean examination or observation of Work completed or in progr ess to determine <br />its compliance with the Contract Documents. <br />2.17. “Equal to” or “approved equal” shall mean materials, products, equipment, assemblies, or <br />installation methods considered equal by the bidder in all characteristics (physical, functional, and <br />aesthetic) to those specified in the Contract Documents. <br />2.18. “Substitution” or “substitute” shall mean materials, products, equipment, assemblies, or installation <br />methods deviating in at least one characteristic (physical, functional, or aestheti c) from those <br />specified, but which in the opinion of the bidder would improve competition and/or enhance the <br />finished installation. <br />2.19. “Provide” or “provides” shall mean furnished or furnished and installed by the CMAR or its <br />Subcontractors as more fully described in the Contract Documents. <br />3. CMAR CONSTRUCTION FEE AND GENERAL CONDITIONS COSTS <br />3.1. The CMAR shall be entitled to payment of a fee (the CMAR Fee) for its services on the Project, <br />and shall be entitled to reimbursement of costs as set forth herein, all within the Total Construction <br />Budget as adjusted by the Orange County Board of Commissioners (the “Board”) in accordance <br />with 2.76 above. <br />3.2. Provided that the Total Construction Budget remains $ , the CMAR Fee shall not exceed $ <br /> , subject to modification and limitation as set forth herein. If the Owner changes the Total <br />Construction Budget, the CMAR Fee shall not exceed three percent (3%) of the sum of (i) the Cost <br />of the Work, (ii) the CMAR-GMP Contingency, and (iii) the CMAR General Conditions, (but not <br />including the Early Completion Bonus Fund) all as more fully defined in this Contract, as of the <br />date when the final GMP is established and approved by the Owner, subject to modification and <br />limitation as set forth herein. The CMAR Fee will include all CMAR home office personnel costs, <br />including officers as well as home office and local office support staff not included in General <br />Conditions below, together with all other CMAR overhead costs and profit. This Fee shall also <br />include all home office quality control and safety reviews, as well as all required services of a <br />home office Project executive, by whatever name called. CMAR costs which are not to be included <br />in the CMAR Fee are the costs of all Subcontracts, on-site field staff, General Conditions costs (as <br />provided below), and the CMAR-GMP Contingency described below. <br />3.3. When a GMP is established and approved for a defined phase of the Work, the CMAR Fee for that <br />GMP shall be converted to a lump sum and be included in the GMP. When the final GMP is <br />established and approved, the CMAR agrees that the cumulative CMAR Fee shall not exceed the <br />maximum amount set forth above in paragraph 3.2, and shall not cause the final GMP to exceed the <br />Total Construction Budget approved by the Owner. Thereafter, the CMAR Fee shall not be <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.