Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 53 <br />5-2-25 <br /> <br />4.1. Upon final review submission by the Project Designer of Construction Documents for an agreed <br />phase of the Work, the CMAR will develop and provide to the Owner a GMP for that phase which <br />will include all costs of construction, (hereinafter sometimes referred to as “Cost of the Work”), <br />and all other projected costs including without limitation the CMAR Fee, the CMAR-GMP <br />Contingency and General Conditions allowance, but not including the Owner’s Construction <br />Contingency. The Early Completion Bonus Fund will not be included in any GMP until the final <br />GMP, at which time the Early Completion Bonus will be included in the GMP. The GMP shall set <br />out each anticipated Subcontract amount, the CMAR fixed Fee, the General Conditions Allowance <br />costs including on-site field staff, and all Project related costs, i.e., bonds, personnel payroll <br />benefits, etc. The allocation, basis and distribution of the cost of construction, CMAR Fee, General <br />Conditions and CMAR-GMP Contingency for each GMP shall be set out in detail in each GMP <br />amendment. <br />4.2 The GMP shall reflect all cash discounts obtained on payments made by the CMAR or any <br />Subcontractor, which shall be for the benefit of the Owner. Trade discounts, rebates, refunds, and <br />amounts received from sales of surplus or salvaged materials and equipment shall accrue to the <br />Owner and the CMAR shall make provisions so they can be secured and shall reduce the GMP <br />accordingly. Amounts which accrue to the Owner in accordance with this section shall be <br />accounted for and credited to the Owner as a deduction from the Cost of the Work or the General <br />Conditions as appropriate. <br />4.3. Not later than 12/01/2025, provided the Designer submits by 08/01/2025 and the Owner approves <br />final submission by the Project Designer of the last of the complete Construction Documents for <br />the entire Project by 09/01/2025, the CMAR will develop and submit its final GMP for the Project. <br />At that time, the Total Construction Budget will be fixed, subject to changes only as set forth <br />herein by change order. Until that time, the CMAR agrees to use its best efforts to work with the <br />Project Team to keep the cost of the Project within the Total Construction Budget. <br />4.4. At no time shall the CMAR Fee, General Conditions, CMAR-GMP Contingency, or the Early <br />Completion Bonus Fund exceed the amounts for these respective items within the Total <br />Construction Budget. The sum of all GMP must not exceed the Total Construction Budget, <br />including CMAR Fees, overhead, and escalation until TBD as set forth on the RFQ Data Sheet, <br />unless and to the extent that the Total Construction Budget is increased or decreased by the Board. <br />4.5. Each GMP for a phase of the Work shall identify the Construction Drawings that define the scope <br />of work covered by the GMP, shall describe any assumptions or clarifications concerning the scope <br />of the Work, shall describe any special allowances and the basis on which each allowance was <br />calculated, and shall contain the progress schedule related to that phase of the Work. <br />4.6. If or when the GMP (or projected value of all GMPSs) exceeds the Total Construction Budget, the <br />Owner and CMAR will work in conjunction with the Project Designer to redesign the Project as <br />necessary to maintain the Project program and meet the Total Construction Budget as follows: <br />4.6.1. After consultation with the Owner, the CMAR shall coordinate and cooperate with the <br />Project Team to alter and redraft Construction Documents as necessary to accomplish the <br />required reduction in cost. <br />4.6.2. The CMAR shall develop and provide to the Owner a GMP in connection with the <br />redrafted and altered Construction Documents to accomplish the necessary reductions in <br />cost. <br />4.6.3. The CMAR shall analyze the Project Designer’s originally submitted and as altered and <br />redrafted Construction Documents, and make recommendations to the Owner as to ways <br />and methods to reduce the costs of constructing the Project to a sum which does not <br />exceed the Total Construction Budget. Notwithstanding anything in the RFQ to the <br />contrary, the CMAR shall perform the Work set forth in this section without additional <br />compensation. The Owner has the right to reject any GMP as originally submitted, or as <br />adjusted. In that event, the Contract may be terminated according to its terms. In addition, <br />the Owner has the right to withhold, in its sole discretion, approval of the amendment of <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.