Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 53 <br />5-2-25 <br /> <br />3.5.6. General: Provide temporary weather and dust protection (that which must practically <br />remain outside of construction) as may be required during construction phases. Provide <br />field personnel pagers, and two-way radio throughout the construction phases, as <br />applicable. Include travel expenses for field personnel related to off-site <br />equipment/materials survey and inspections. Field staffing needs shall be provided by the <br />CMAR as part of General Conditions per the RFQ documents, and shall be limited to the <br />specific staff positions noted. Provide Project supervisory personnel, as may be required, <br />throughout the construction phases; i.e., the Project superintendent. Provide field office <br />support staff, as may be required, throughout the construction phases, i.e., secretarial, <br />laborers, etc. <br />3.5.7. Insurance/Bond: Provide 100% Performance and Payment Bonds. Provide liability <br />insurance and provide builder’s risk insurance policy in the amount of the GMP unless <br />directed otherwise by Owner’s Representative in accordance with any Owner Controlled <br />Insurance Program (“OCIP”). <br />3.5.8. Close-Out/De-Mobilization: Provide final site/facility clean up. Provide final release of <br />liens for all contracts. Provide sets of all Subcontractor as-built drawings to the Owner <br />and Designer; one set will be used by the Project Designer to prepare as-built drawings. <br />3.6. Expenditures in excess of General Conditions category totals may be made if and only if the <br />CMAR can first certify to the Owner that identified funds in other General Conditions categories <br />within the specific GMP are in excess of actual needs. The CMAR will be reimbursed for actual <br />General Conditions costs only as they are incurred, with no mark-up by the CMAR. Other <br />expenditures in excess of the total General Conditions allowance that are not covered in the Cost of <br />Work may be paid out of the CMAR Contingency as allowed hereunder, or are deemed included in <br />the CMAR’s Construction Fee. <br />3.7. The Owner reserves the right to adjust the Total Construction Budget at any time prior to <br />agreement on the final GMP. Subject to the Owner’s right to adjust the Total Construction Budget, <br />any unused balance from each General Conditions allowance may be carried forward by the <br />CMAR to each subsequent GMP, and to the end of the Project. Any unused portion of the total <br />General Conditions allowance remaining after the Project is finally complete shall be returned to <br />the Owner. <br />3.8. Costs for on-site field staff, will be included in the General Conditions allowance. Field personnel <br />costs shall be billed at Direct Personnel Expenses/ Employee costs (direct salary) plus all of <br />CMAR’s customary payroll benefits [including but not limited to FICA, SUTA, FUTA, 401K, <br />vacation leave, sick leave, holidays, jury duty leave and bereavement leave] with no employee <br />overhead mark up. The on-site field staff is limited to full time staff which includes the Project <br />Engineer(s), Superintendent(s) actually furnishing services to the Project, Field Secretaries/Clerks, <br />and occasional laborers (on as needed basis), as amended from time to time by agreement of the <br />parties. Other CMAR positions will be deemed included in the CMAR Construction Fee. <br />3.9. Additional General Conditions costs alleged to arise from any Owner-requested change orders to <br />the Work of the Project will be reviewed on an individual change order basis. After consultation <br />with the Project Designer, the Owner shall determine whether the requested increases are caused by <br />an Owner-requested change order. Absent extraordinary circumstances, the CMAR should not <br />expect that any change order other than those requested by the Owner or for delays that require an <br />extension of time will allow for an increase in its General Conditions. <br /> <br />3.10. The CMAR shall be entitled to an increase in direct Costs of the Work, the CMAR Fee and General <br />Conditions and an extension of time on account of differing site conditions. <br /> <br /> <br />4. CONSTRUCTION GUARANTEED MAXIMUM PRICE (“GMP”) <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.