Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 16 <br /> <br />1. Project Overview: <br /> <br />Orange County is seeking a Construction Manager at Risk to help develop and build a <br />Crisis Diversion Facility on a 5-acre plot in Hillsborough, North Carolina (see attached <br />preliminary site development plan). The Crisis Diversion Facility is intended to divert <br />individuals experiencing a behavioral health crisis from hospital emergency departments <br />and the County’s Detention Center by offering 1.) Behavioral health urgent care services <br />for assessment, stabilization, treatment, and aftercare planning for patients 4 years old <br />and older and 2.) Facility-based crisis services for adults for longer-term treatment. The <br />facility will be a 27,000 sq. ft. single-story building with 12 behavioral Health Urgent Care <br />bays and 16 facility-based care beds. The County is negotiating to purchase the property <br />that will be the site for the facility. <br /> <br />2. Anticipated Project Schedule: <br /> <br />Project Activities Duration <br /> <br />Schematic Design February 2025 <br />Design Development Spring 2025 <br />Construction Documents Summer 2025 <br />Permitting August – September 2025 <br />Construction Bidding October 2025 <br />Construction November 2025 – October 2026 <br /> <br /> <br /> <br />3. Project Design Team: <br /> <br />Orange County has selected CPL through a qualifications-based process to provide <br />architectural and engineering design services for the Crisis Diversion Facility. CPL was <br />previously selected to provide preliminary and schematic-level design and analysis <br />services for developing the facility. CPL was awarded the contract on September 17th, <br />2024, and has already begun schematic design. The selected CMAR will coordinate with <br />CPL for the duration of the project's design and construction phases. <br /> <br /> <br />4. Scope of Construction Manager at Risk (CMAR) Services <br />The scope of services below is meant to provide interested firms with an outline of the <br />anticipated services required for this project. The detailed scope of services will be <br />contained in the executed Contract for CMAR Services. The County intends to use the <br />attached template contract as the form of agreement. <br /> <br /> <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.