Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 40 of 53 <br />5-2-25 <br /> <br />42.5. Provided a proper and complete application for payment is received by the <br />Project Designer not later than the 1st day of a given month, the Owner shall <br />make payment to the CMAR not later than the last day of the same month. If an <br />application for payment is received by the Project Designer after the application <br />date fixed above, payment shall be made by the Owner not later than thirty days <br />after the Project Designer receives the application for payment. Interest will be <br />assessed on all progress payments not received within the thirty (30) day terms. <br />Owner shall be charged interest calculated at the current Prime Interest Rate + <br />2%. Payment instructions will be provided, and preferred method is via wire or <br />ACH. <br /> <br />42.6. With each application for payment for Work performed directly by the CMAR and such <br />Subcontractors as the Owner may specify, the CMAR shall submit transaction summaries and, if <br />requested by the Owner, payrolls, petty cash accounts, receipted invoices or invoices with check <br />vouchers attached, and any other evidence required by the Owner or Project Designer to <br />demonstrate that cash disbursements already made by the CMAR on account of general conditions <br />and the Cost of the Work equal or exceed (1) progress payments already received by the CMAR <br />less (2) that portion of those payments attributable to the CMAR’s Fee; plus (3) payrolls and costs <br />for the period covered by the present application for payment. <br /> <br />42.7. The CMAR shall submit a schedule of values that allocates the entire GMP among the various <br />portions of the Work, except that the CMAR’s Fee shall be shown as a separate item. The schedule <br />of values shall be prepared in such form and supported by such data to substantiate its accuracy as <br />the Project Designer may require. This schedule, unless objected to by the Project Designer, shall <br />be used as a basis for reviewing the CMAR’s applications for payment. The Project Designer may <br />also use the Project critical path schedule when reviewing the CMAR’s applications for payment. <br /> <br />42.8. Each application for payment shall be compared to the most recent schedule of values submitted by <br />the CMAR. Applications for payment shall show the percentage completion of each portion of the <br />Work as of the end of the period covered by the application for payment. The percentage <br />completion shall be the percentage of that portion of the Work which has actually been completed. <br /> <br />42.9. Subject to other provisions of the Contract, the amount of each progress payment shall be <br />computed as follows: <br /> <br />42.9.1. Take that portion of the GMP properly allocable to completed Work as determined by <br />multiplying the percentage completion of each portion of the Work by the share of the GMP <br />allocated to that portion of the Work in the schedule of values. <br /> <br />42.9.2. Add that portion of the GMP properly allocable to materials and equipment delivered and <br />suitably stored at the site for subsequent incorporation in the Work or if approved in <br />advance by the Owner, suitably stored off site at a location agreed upon in writing. <br /> <br />42.9.3. Add the CMAR’s Fee: the CMAR’s portion of the Fee for construction phase services <br />shall be an amount which bears the same ration to the fixed-sum Fee as the total payment <br />described in the two preceding clauses bears to the cost of the Work defined in the <br />Contract Documents. <br /> <br />42.9.4. Subtract the aggregate of previous payments made by the Owner. <br /> <br />42.9.5. Subtract the amount, in any, by which the CMAR has been previously overpaid, as <br />evidenced by the Owner’s review of the CMAR’s documentation required herein or by <br />any audit of the CMAR records. <br /> <br />42.9.6. Subtract amounts, if any, for which the Project Designer has withheld or nullified a <br />certificate of payment. <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.