Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 37 of 53 <br />5-2-25 <br />33.3. A claim for extra cost shall include a claim for an increase in the CMAR Fee. Approved claims for <br />extra cost, will be considered change orders for which CMAR is entitled to an increase in its Fee <br />under Paragraph 3.3 herein. <br />33.4. If the parties are unable to agree to the reasonable cost and time to perform the change, or are <br />unable to agree as to whether a change occurred, the Owner’s representative shall make a unilateral <br />determination regarding the basis of proceeding, subject to dispute resolution at a later time. The <br />CMAR shall proceed with the Work as directed by the Owner’s representative. <br />33.5. Should a claim for an increase in the GMP by the CMAR be denied by the Owner the CMAR may <br />request mediation in connection with the dispute resolution rules adopted for this Project. <br />34.DIFFERING SITE CONDITIONS <br />34.1. Should the CMAR encounter subsurface or latent conditions, or both at the site materially differing <br />from those shown on the drawings or indicated in the specifications or differing materially from <br />those ordinarily encountered and generally recognized as inherent in Work of the character <br />provided for in this Contract, the CMAR shall immediately, and in no event later than thirty (30) <br />days later, give notice to the Owner of such conditions before they are disturbed. The Owner and <br />the Project Designer shall thereupon promptly investigate the conditions and if they find that they <br />materially differ from those shown on the drawings or indicated in the specifications, they shall at <br />once make such changes in the drawings and/or specifications as they may find necessary. Any <br />increase or decrease in the Cost of the Work resulting from such changes shall be adjusted in the <br />manner provided herein for adjustments as to extra and/or additional Work and changes. However, <br />neither the Owner nor the Project Designer shall be liable or responsible for additional Work, costs <br />or changes to the Work that could have been reasonably determined from any geotechnical, soils <br />and other reports, surveys and analyses made available for the CMAR's review or that could have <br />been discovered by the CMAR through the performance of its obligations pursuant to this Contract. <br />35.CORRECTION OF WORK BEFORE FINAL PAYMENT <br />35.1. Any Work, materials, fabricated items or other parts of the Work which have been condemned, <br />rejected, or declared not in accordance with the Contract by the Project Designer shall be promptly <br />removed from the Work site by the CMAR, and shall be immediately replaced by new Work in <br />accordance with the contract at no additional cost to the Owner. Work or property of the Owner, <br />damaged or destroyed by virtue of such faulty Work, shall be made good at the expense of the <br />CMAR. <br />35.2. Correction of condemned Work described above shall commence within seventy-two (72) hours <br />after receipt of notice from the Project Designer, and shall make satisfactory progress until <br />completed. <br />35.3. Should the CMAR fail to proceed with the required corrections, then the Owner shall have the right <br />to complete the Work under the terms herein. <br />36.CORRECTION OF WORK AFTER FINAL PAYMENT <br />36.1. Neither the final certificate, final payment, occupancy of the premises by the Owner, nor any <br />provision of the Contract, nor any other act or instrument of the Owner, nor the Project Designer, <br />shall relieve the CMAR from responsibility for negligence, for faulty material or workmanship, for <br />breach of any warranty or guarantee, or for failure to comply with the drawings and specifications. <br />The CMAR shall correct any defects due thereto and repair any damage resulting therefrom, which <br />may appear during the guarantee period following Substantial Completion of the Work in <br />accordance with its warranty and guarantee. The Owner will report any defects as they may appear <br />to the CMAR and establish a time limit for completion of corrections by the CMAR. The Owner <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.