Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 36 of 53 <br />5-2-25 <br /> <br />Owner daily time and material tickets, to include the identification number assigned to the change <br />in the Work, the location and description of the change in the Work, the classification of labor <br />employed (and names and social security numbers), the materials used, the equipment rented (not <br />tools) and such other evidence of cost as the Owner may require. The Owner may require <br />authentication of all time and material tickets and invoices by persons designated by the Owner for <br />such purpose. The failure of the CMAR to secure any required authentication shall constitute a <br />waiver by the CMAR of any claim for the cost of that portion of the change in the Work covered by <br />a non-authenticated ticket or invoice. <br /> <br />32.19. [Intentionally omitted.] <br /> <br />32.20. At the time of signing a change order, the CMAR shall be required to certify as follows: “I certify <br />that my bonding company will be notified forthwith that my contract has been changed by the <br />amount of this change order, and that a copy of the approved change order will be mailed upon <br />receipt by me to my surety.” <br /> <br />32.21. A change order, when issued, shall be full compensation, or credit, for the Work included, omitted <br />or substituted. It shall show on its face the adjustment in time for completion of the Project as a <br />result of the change in the Work. <br /> <br />32.22. No changes will invalidate, relieve or release the CMAR from any guarantee given by him <br />pertinent to the contract provisions. No changes will affect the validity of the performance bond or <br />relieve the surety on said bond. <br /> <br />32.23. In the event of emergency endangering life or property, the CMAR and the Subcontractors may be <br />directed to proceed on a time and material basis by the Owner’s Representative whereupon the <br />CMAR shall proceed and keep accurately on such form as may be required, a correct account of <br />costs together with all proper invoices, payrolls and supporting data. Upon completion of the Work <br />the change order will be prepared and settled as outlined herein. <br /> <br />33. CLAIMS FOR EXTRA COST <br /> <br />33.1. If the CMAR or any of its Subcontractors asserts that any event or occurrence has caused a change <br />in or addition to the Work which change causes an increase or decrease in the GMP or the time <br />required for the performance of any part of the Work under the Contract, including Work not <br />affected directly by the change, the CMAR shall, within ten (10) working days of such event, give <br />the Owner and Project Designer written notice as herein required. Said notice shall include the <br />instructions or circumstances that are the basis of the claim and the CMAR's best estimate of the <br />cost and time involved. The statement of claim hereunder may be included in the notice required <br />above. The statement of claim shall include all direct, indirect and impact costs associated with the <br />change, as well as the CMAR's estimate of the schedule impact of the change, if any. The CMAR <br />and its Subcontractors shall not be entitled to reimbursement or an increase in the GMP for any <br />claims that are not filed in strict conformance with this section. The CMAR shall not proceed with <br />the Work affected until further advised, except in emergency involving the safety of life or <br />property. No claims for extra compensation will be considered unless the claim is so made. The <br />Project Designer shall review and render a written decision on each claim for extra cost within <br />seven (7) days of receipt of claim. Failure to submit a timely claim for additional cost will <br />constitute a waiver of said claim. <br /> <br />33.2. The CMAR shall not act on instructions received by it from persons other than the Project <br />Designer, and any claims for extra compensation or extension of time on account of such <br />instruction will not be honored. The Project Designer will not be responsible for misunderstandings <br />claimed by the CMAR of verbal instructions which have not been confirmed in writing, and in no <br />case shall instructions be interpreted as permitting a departure from the Contract Documents unless <br />such instruction is confirmed in writing and supported by a properly authorized change order. <br /> <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.