Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 31 of 53 <br />5-2-25 <br /> <br />pursuant to the Contract Documents, for such Work or portion thereof as provided in the Contract <br />Documents. <br /> <br />28.5. The acceptance of substantial completion payment shall constitute a waiver of all claims for <br />payment by the CMAR and its Subcontractors, except those previously made in writing and <br />identified by the CMAR as unsettled at the time the CMAR submits the application for payment for <br />substantial completion, and except for the retained sums due at final acceptance. <br /> <br />28.6. In addition to any and all other indemnification required by this Contract the CMAR shall <br />indemnify and hold the Owner harmless against any claims by its Subcontractors that are waived <br />because they were not made in writing and identified by the CMAR as unsettled when the CMAR <br />submitted the application for payment for substantial completion. <br /> <br />28.7. The Owner shall have the option to correct or complete any and all punch list items not completed <br />by the CMAR to the satisfaction of the Project Designer and the Owner within forty five (45) days <br />for any GMP package of less than 1 year’s duration and not more than ninety (90) days from the <br />actual date of substantial completion for any GMP package of more than 1 year’s duration by <br />utilizing its own forces or by hiring others. The cost of such correction of remaining punch list <br />items by the Owner or others shall be deducted from the final payment to the CMAR. <br /> <br />28.8. If CMAR does not complete certain punch list items within the required time period, all warranties <br />and guarantees for such incomplete punch list items shall become effective upon CMAR <br />submitting to the Owner and Project Designer certification of the date such items were completed <br />and approval by the Owner’s Representative and Project Designer.. The issuance of the certificate <br />of substantial completion does not indicate final acceptance of the Project by the Owner, and the <br />CMAR is not relieved of any responsibility for the Project except as specifically stated in the <br />certificate of substantial completion. <br /> <br />28.9. Should the Project Designer and the Owner determine that the Work or a designated portion thereof <br />is not substantially complete, they shall provide the CMAR with written notice stating why the <br />Work or designated portion is not substantially complete. The CMAR shall expeditiously complete <br />the Work and shall re-request in writing that the Project Designer perform another substantial <br />completion inspection. Costs, if any, associated with such re-inspection shall be assessed to the <br />CMAR at the rates specified in the Project Designer’s contract. <br /> <br />29. PARTIAL UTILIZATION/BENEFICIAL OCCUPANCY <br /> <br />29.1. The Owner may desire to occupy or utilize all or a portion of the Project when the Work for that <br />portion is substantially complete. <br /> <br />29.2. Prior to the final payment, the Owner may request the CMAR in writing, through the Project <br />Designer if applicable, to permit the Owner to use a specified part of the Project which the Owner <br />believes it may use without significant interference with construction of the other parts of the <br />Project. If the CMAR agrees, the Project Designer will schedule a beneficial occupancy inspection <br />after which the Project Designer may issue a certificate of substantial completion. The certificate <br />shall include the following documentation: <br /> <br />29.2.1. Date of substantial completion. <br /> <br />29.2.2. A tentative list of items to be completed or corrected before final payment. <br /> <br />29.2.3. Establishing responsibility between the CMAR and Owner for maintenance, heat, utilities <br />and insurance. <br /> <br />29.2.4. Establishing the date for guarantees and warranties under the terms of the Contract. <br /> <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.