Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 24 of 53 <br />5-2-25 <br />24.1.11. CMAR submits GMP # 3 to Owner TBD <br />24.1.12. Presentation of Design Development TBD <br />24.1.13. Board approval of GMP #3 TBD <br />24.1.14. GMP #4 Design Package Completion TBD <br />24.1.15. CMAR submits GMP # 4 to Owner TBD <br />24.1.16. Board approval of GMP #4 TBD <br />24.1.17. GMP #5 Design Package Completion TBD <br />24.1.18. CMAR submits GMP # 5 to Owner TBD <br />24.1.19. Presentation of Construction Documents TBD <br />24.1.20. Board approval of GMP #5 TBD <br />24.1.21. Substantial Completion – Move In TBD <br />24.1.22. Punch List Completion TBD <br />24.1.23. Project Final Completion TBD <br />24.1.24. Completion of Closeout and Warranty TBD. <br />24.2. The Project shall be brought to Substantial and Final Completion within the time prescribed by the <br />Project schedule that is updated and established at the time the final GMP is accepted, which shall <br />be in accord with the foregoing target schedule as extended by the Owner by change order in <br />accordance with the Contract. <br />24.3. If the CMAR is delayed at any time in the progress of its Work by any act or negligence of the <br />Owner or the Project Designer, or Owner’s Separate Contractor(s), or by any employee of either; <br />by changes ordered in the Work; by any event covered under the builders risk “all risk” policy, by <br />labor disputes at the Project site; by abnormal weather conditions not reasonably anticipated for the <br />locality where the Work is performed; by unavoidable casualties; by public health crises including <br />pandemics/epidemics and governmental actions in response thereto; any causes beyond the <br />CMAR’s control; or by any other causes which the Project Designer and Owner determine may <br />justify the delay, then the contract time may be extended by change order for the time which the <br />Project Designer and Owner may determine is reasonable and the Guaranteed Maximum Price <br />equitably adjusted accordingly by Change Order. Contract defaults or other breaches of any legal <br />duty by a Subcontractor shall not be grounds for a time extension under this Contract. Time <br />extensions will not be granted for rain, wind, snow or other natural phenomena of normal intensity <br />for the locality where Work is performed. For purpose of determining the extent of delay <br />attributable to unusual weather phenomena, a determination shall be made by comparing the <br />weather for the contract period involved with the average of the preceding twenty (20) year <br />climatic range during the same time interval based on the National Oceanic and Atmospheric <br />Administration National Weather Service statistics for the locality where Work is performed and on <br />daily weather logs kept on the job site by the CMAR reflecting the effect of the weather on <br />progress of the Work and initialed by the Project Designer. Time extensions for weather delays <br />shall not entitle the CMAR to an increase in the GMP. <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.