Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 23 of 53 <br />5-2-25 <br /> <br />correct such variations and deviations from the Construction Documents. The CMAR shall provide <br />two sets of all inspection reports (in binder form) as part of the job progress meetings to the Project <br />Designer and the Owner. <br />23.6. The Owner reserves the right to independently contract for compliance inspection and testing. The <br />CMAR shall incorporate and coordinate its services with inspections agents provided by the Owner <br />in general accordance with the State of North Carolina, Department of Administration, State <br />Construction Office’s “Special Inspections Guidelines” <br />23.7. The CMAR shall record and effectuate the correction of deficiencies submitted by the Owner and <br />the Project Designer subject at all times to the dispute resolution procedures incorporated herein. <br />23.8. The Project Designer shall in all cases make final interpretation of the Contract Documents and rule <br />on compliance of the Work. <br />23.9. Should any Work be covered up or concealed prior to required inspection and approval by the <br />Project Designer, such Work shall be uncovered or exposed for inspection, if so requested by the <br />Project Designer in writing. Inspection of the Work will be made promptly upon notice from the <br />Subcontractor. All cost involved in uncovering, repairing, replacing, recovering and restoring to <br />design condition, the Work that has been covered or concealed will be paid by the CMAR. <br /> <br />23.10. If any other portion of the Work has been covered which the Project Designer has not specifically <br />requested to observe prior to being covered, the Project Designer or Owner’s Representative may <br />request to see such Work and it shall be uncovered by the CMAR. If such Work be found in <br />accordance with the Construction Documents, the cost of uncovering and replacement shall, by <br />appropriate change order, be charged to the Owner. If such Work be found not in accordance with <br />the Contract Documents, the CMAR shall pay such costs. <br /> <br />24. TIME OF COMPLETION, DELAYS, EXTENSION OF TIME <br /> <br />24.1. The pre-construction services schedule shall not exceed one calendar year from the execution of <br />this Agreement. Once the Notice to Proceed is issued, the CMAR will complete construction <br />services within sixteen (16) months and one (1) month for state and local occupancy permitting <br />inspections, for a total of seventeen (17) months. The CMAR shall commence provision of <br />services under this Contract not later than five days after the date of this Contract, and shall fully <br />complete all services hereunder and accomplish the substantial and final completion of the Project <br />in accordance with the following target schedule, which shall be adhered to unless otherwise agreed <br />by the Owner: <br /> <br />24.1.1. GMP#1 – Design Package Completion TBD <br /> <br />24.1.2. CMAR submits GMP#1 to Owner TBD <br /> <br />24.1.3. Board Approval of GMP#1 TBD <br /> <br />24.1.4. GMP#2 – Design Package Completion TBD <br /> <br />24.1.5. Presentation of Schematic Design TBD <br /> <br />24.1.6. Completion of Schematic Design TBD <br /> <br />24.1.7. CMAR submits GMP#2 to Owner TBD <br /> <br />24.1.8. Board approval of GMP #2 TBD <br /> <br />24.1.9. Completion of Design Development TBD <br /> <br />24.1.10. GMP #3 – Design Package Completion TBD <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.