Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 19 of 53 <br />5-2-25 <br /> <br />19.8.1. Prior to acceptance of Work by the Owner, the CMAR shall coordinate the removal and <br />replacement of any parts of the permanent building systems damaged through use during <br />construction. <br /> <br />19.8.2. Temporary closures or filters shall be installed in each of the heating and air conditioning <br />units and at each return grille during construction. New filters shall be installed in each <br />unit prior to the Owner’s acceptance of the Work. <br /> <br />19.8.3. Extra effort shall be maintained to keep the building and the site adjacent to the building <br />clean. Under no circumstances shall air systems be operated if finishing and site Work <br />operations are creating dust in excess of what would be considered normal if the building <br />were occupied. <br /> <br />19.8.4. It shall be understood that any warranty on equipment presented to the Owner shall <br />extend from the earlier of substantial completion or occupancy by the Owner. The cost of <br />maintaining the equipment during operation in the finishing stages of construction shall <br />be borne by the Subcontractor whose system is utilized. <br /> <br />19.8.5. The CMAR shall ensure that all lamps are in proper working condition at the time of final <br />Project acceptance. <br /> <br />19.9. The CMAR shall provide, if required and where directed, a shed for toilet facilities and <br />shall furnish and install in its shed all water closets required for a complete and adequate <br />sanitary arrangement. These facilities will be available to other Subcontractors on the job <br />and shall be kept in a neat and sanitary condition at all times. Chemical toilets are <br />acceptable. <br /> <br />19.10. The CMAR shall, if needed and where directed by the Owner’s Representative, erect a <br />temporary field office, complete with lights, telephone, heat and air conditioning. A <br />portion of this office shall be partitioned off, of sufficient size, for the use of the Project <br />Designer, should the Owner’s Representative so direct. <br /> <br />19.11. The CMAR is responsible for making temporary elevators, lifts, or other special <br />equipment available for the general use of all Subcontractors but also may require such <br />Subcontractors to execute CMAR’s required form of release and indemnity agreement. <br />The cost for such elevators, lifts or other special equipment and the safe and efficient <br />operation thereof may be included in the CMAR’s General Conditions. <br /> <br />19.12. The CMAR will erect one sign on the Project, and may erect others if approved by the <br />Owner’s Representative. The sign(s) shall be of sound construction, and shall be neatly <br />lettered. The sign(s) shall bear the name or logos approved by the Owner’s <br />Representative of participants on the Project, and the CMAR’s name, and the name of the <br />Project Designer and consultants. Directional signs may be erected on the Owner’s <br />property subject to approval of the Owner with respect to size, style and location of such <br />directional signs. Such signs may bear the name of the CMAR and a directional symbol. <br />All signs must comply with all local sign, appearance, and traffic ordinances. No other <br />signs will be permitted except by permission of the Owner’s Representative. <br /> <br />20. CLEANING UP <br /> <br />20.1. The CMAR shall ensure that the building and surrounding area is reasonably free from rubbish at <br />all times, and shall remove debris from the site on a timely basis or when directed to do so by the <br />Owner’s Representative. The CMAR shall provide an on-site refuse container(s) for the use of all <br />Subcontractors. The CMAR shall ensure that each Subcontractor removes their rubbish and debris <br />from the building on a daily basis. The CMAR shall ensure that the building is broom cleaned as <br />required to minimize dust and dirt accumulation. <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.