Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 42 <br />Revised 12/24 <br /> <br />43.2. The Owner reserves the right, prior to making final payment to the CMAR, to conduct a final audit <br />of the expenditures by the CMAR on the Project for assurances that the final payment to the <br />CMAR does not exceed the amounts properly payable to the CMAR for the Cost of the Work, <br />General Conditions, any special allowances, and CMAR-GMP Contingency savings. In the event <br />an audit determines that the CMAR has been paid more than it is entitled to be paid under the <br />Contract, the CMAR will refund the overpayment to the Owner. <br /> <br />43.3. The making and acceptance of final payment shall constitute a waiver of all claims by the Owner <br />except: <br /> <br />43.3.1. Claims arising from unsettled liens or claims against the CMAR. <br /> <br />43.3.2. Faulty Work or materials appearing after final payment. <br /> <br />43.3.3. Failure of the CMAR to perform the Work in accordance with drawings and <br />specifications, such failure appearing after payment. <br /> <br />43.3.4. As conditioned in the performance bond and payment bond. <br /> <br />43.4. The making and acceptance of final payment shall constitute a waiver of all claims by the CMAR <br />except those claims previously made and remaining unsettled. <br /> <br />43.5. Prior to submitting request for final payment to the Project Designer for approval, the CMAR shall <br />fully comply with all requirements specified in the “Project closeout” section of the specifications. <br />These requirements include but not limited to the following: <br /> <br />43.5.1. Submittal of Product and Operating Manuals, Warranties and Bonds, Guarantees, <br />Maintenance Agreements, As-Built Drawings, Certificates of Inspection or Approval <br />from agencies having jurisdiction. (The Project Designer must approve the Manuals prior <br />to delivery to the Owner). <br /> <br />43.5.2. Transfer of required attic stock material and all keys in an organized manner. <br /> <br />43.5.3. Record of Owner’s training. <br /> <br />43.5.4. Resolution of any final inspection discrepancies. <br /> <br />43.6. The CMAR shall forward to the Project Designer the final application for payment along with the <br />following documents: <br /> <br />43.6.1. List of minority business subcontractors and material suppliers showing breakdown of <br />contracts amount. <br /> <br />43.6.2. Affidavit of Release of Liens. <br /> <br />43.6.3. Affidavit of Subcontractors of payment to material suppliers and subcontractors. <br /> <br />43.6.4. Consent of Surety to Final Payment. <br /> <br />43.6.5. Certificates of state agencies required by state law. <br /> <br />43.7. The Project Designer will not authorize final payment until the Work under contract has been <br />certified by Project Designer, certificates of compliance issued, and the CMAR has complied with <br />the closeout requirements. The Project Designer shall forward the CMAR’s final application for <br />payment to the Owner along with respective certificate(s) of compliance required by law. <br /> <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.