Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 33 <br />Revised 12/24 <br /> <br /> <br />30.4.1. That the Project is completed and accepted. <br /> <br />30.4.2. That the Project is accepted subject to the list of discrepancies (punch list). Subject to <br />unavoidable delays in the delivery of materials needed to correct or complete discrepancies , all <br />punch list items must be completed within thirty (30) days of acceptance or the Owner may invoke <br />Owner’s Right to Do Work. <br /> <br />30.4.3. That the Project is not complete and another date for a final inspection will be established. <br /> <br />30.5. Within fourteen (14) days of acceptance or within fourteen (14) days after completion of punch list, <br />the Project Designer shall certify the Work and issue applicable certificate(s) of compliance. <br /> <br />30.6. Any discrepancies listed or discovered after the date of final inspection and acceptance shall be <br />resolved as a warranty item. <br /> <br />30.7. The CMAR shall obtain as-built and product data from Subcontractors and maintain a current set of <br />record drawings, specifications and operating manuals. For mechanical and electrical equipment, <br />the CMAR is to obtain the operating and maintenance (O&M) manuals at least three (3) months <br />prior to the demonstration for such equipment. These O&M manuals are to be sent to the Owner’s <br />representative who is to forward one (1) set to the Owner’s department responsible for maintaining <br />the facility for review prior to the equipment demonstration. <br /> <br />30.8. At the completion of the Project and before final payment, the CMAR shall deliver a complete set <br />of as-built drawings for use by the Project Designer in preparing Record Drawings. <br />31. COST CONTROL <br /> <br />31.1. The CMAR shall develop and maintain an effective system of Project cost control. Elements of the <br />system of Project cost control will include Project budgets, GMP proposals, the critical path <br />schedule, and cash flow forecasts and reports, all in formats to be approved by the Owner. <br />31.2. The CMAR shall incorporate into each element of the system of Project cost control all Owner <br />approved changes as they occur, update and refine the GMP, and develop reports and forecasts as <br />needed, or as directed by the Owner. The CMAR shall identify variances bet ween actual and <br />estimated costs and advise the Owner whenever projected cost exceeds allowances or estimates. <br />31.3. The CMAR shall check and supervise all material deliveries, equipment and labor entering the <br />Work site. The CMAR shall maintain cost accounting records on authorized Work performed under <br />unit costs, actual costs for labor and material, or other bases requiring accounting records, and <br />afford the Owner access to these records and preserve them for a period of three (3) years after <br />final payment. The Owner reserves the right to audit these records during that period. <br />32. CHANGES IN THE WORK <br /> <br />32.1. The CMAR shall develop and implement a system for review, negotiation, and processing of <br />proposed Change Orders. The CMAR shall, with complete suppo rting data, recommend necessary <br />desirable changes to the Owner and the Project Designer for approval. <br />32.2. The Owner unilaterally at any time may have changes made in the Work covered by the Contract, <br />including but not limited to changes: (1) in the specifications or drawings; (2) in the sequence, <br />method or manner of performance of the Work; (3) in the Owner -furnished facilities, equipment, <br />materials, services or site; or (4) directing acceleration in the performance of the Work. <br />Furthermore, it is understood and agreed that refinement and detailing may be accomplished from <br />time to time with respect to the drawings and specifications. The CMAR’s entitlement to an <br />increase in the GMP or an extension of time, or both, if any, for such changes shall be deter mined <br />in accordance with this Contract. <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.