Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 30 <br />Revised 12/24 <br /> <br />insure that shop drawing/submittal packages are submitted in an appropriate manner and, if not, <br />return them to the Subcontractor for proper submission. <br />25.22. The CMAR shall be responsible for tracking and monitoring all shop drawings/submittals <br />throughout construction until all shop drawings/submittals have been approved by the Project <br />Designer and completion reported to the Owner. <br />25.23. The CMAR shall include shop drawings as an agenda item on all Owner meetings and advise the <br />Owner immediately of any delays in the shop drawing and submittal process. <br />25.24. The CMAR shall develop a shop drawing and submittal aging report which is to be submitted to <br />the Owner at each weekly progress meeting. <br />25.25. Approval of shop drawings by the Project Designer shall not be construed as relieving the CM AR <br />from responsibility for compliance with the design or terms of the Contract Documents nor from <br />responsibility of errors of any sort in the shop drawings, unless such error has been called to the <br />attention of the Project Designer in separate writing by the CMAR. <br /> <br />26. SUBSTITUTION REQUESTS <br /> <br />26.1. The CMAR will be responsible for logging all substitution requests. The CMAR will be <br />responsible for reviewing all substitution requests to insure that they are complete; and, if not, <br />return them to the Subcontractor for proper submission. The CMAR will be responsible to review <br />all substitution requests prior to submission to the Project Designer and the Owner. It is to be noted <br />that the Owner discourages substitutions and the Owner’s approval will be granted on ly upon the <br />most persuasive arguments as to quality, function and financial merit regarding a substitution. The <br />CMAR shall be responsible for tracking and monitoring all substitution requests throughout <br />construction until all substitution requests are proc essed by the Project Designer and the Owner. <br />The CMAR shall be responsible to see that all substitution requests are submitted in a timely <br />manner per the specifications. The CMAR shall include substitution requests, if any, on the agenda <br />topic at the Owner’s meetings and advise the Owner immediately of any delays in the substitution <br />request process. <br />27. REQUESTS FOR INFORMATION <br /> <br />27.1. The CMAR will be responsible for developing and implementing a RFI form for use on the Project. <br />The CMAR will be responsible for logging and reviewing all RFI's prior to submission to the <br />Owner and the Project Designer. The CMAR is to insure that the RFI’s submitted are appropriate <br />and not frivolous. The CMAR shall be responsible for tracking and monitoring all RFI’s <br />throughout construction in a timely manner until they are processed by the Project Designer and the <br />Owner. The CMAR shall include RFI’s as an agenda topic at all Owner meetings and advise the <br />Owner immediately of any delays in their process. All responses to the RFI’s that have an added <br />cost impact must also be discussed with the Owner immediately upon such determination. The <br />CMAR shall develop an RFI aging report that is to be submitted to the Owner at each progress <br />meeting. <br />28. SUBSTANTIAL COMPLETION <br /> <br />28.1. The date of substantial completion of the Work or designated portion thereof is the date certified by <br />the Project Designer when the Work or a designated portion thereof is sufficiently complete, in <br />accordance with the Construction Documents, so the Owner can fully occupy and utilize the Work <br />or designated portion thereof for the use for which it is intended, with all of the Project's parts and <br />systems operable as required by the Contract Documents. Only incidental corrective Work and any <br />final cleaning beyond that needed for the Owner's full use may remain for final completion. The <br />issuance of a temporary or final certificate of occupancy shall not, in itself, constitute substantial <br />completion. <br /> <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.