Page | 29 <br />Revised 12/24 <br /> <br />jobsite or elsewhere, and which affect, or may be expected to affect, Project progres s. The diary <br />shall record weather data, including minimum and maximum temperatures, precipitation type and <br />amount, sky conditions, and wind velocities. The diary shall also record all visitors, and include a <br />detailed list of all material deliveries to the site. The diary shall be available to the Owner at all <br />times and shall be turned over to the Owner upon completion of the Contract. <br />25.15. The CMAR shall compile and submit to the Owner daily a summary report consisting of the <br />CMAR’s Daily Diary and each Subcontractor’s daily report describing the construction activities of <br />the day along with manpower and equipment usage, including that of the Subcontractors. <br />25.16. The CMAR shall submit to the Owner and the Project Designer a weekly report of the status of all <br />Work activities. The CMAR is to submit and conform the report format to the Owner’s <br />requirements for these reports and prior to implementation the CMAR must obtain the Owner’s <br />approval of the format. The Owner shall have no duty to respond to any i nformation in the periodic <br />reports, unless the CMAR specifically requests a response or action by the Owner in writing in a <br />separate document. <br /> <br />25.17. The weekly status report shall show the actual Work completed to date in comparison with the <br />original amount of Work scheduled, inclusive of information on the Subcontractors’ Work and the <br />percentage of completion for the Project. The report shall describe major milestones achieved and <br />slipped, including a discussion of each slippage. In addition to schedule information, the report <br />shall contain an overall summary of the financial status of the Project with a cost control report <br />with proposed solutions for resolution of any cost concerns or issues. The report shall contain a <br />summary statement on the status of change orders for the Project inclusive of potential change <br />orders, approved change order and rejected/voided change orders as well as change orders which <br />require the Owner’s immediate attention. The report shall contain a summary statement as to the <br />status of shop drawings, submittals and RFI’s for the Project inclusive of items requiring the Owner <br />and/or the Project Designer’s immediate attention. The report shall contain a summary statement as <br />to the status of quality control/inspections for the Projec t including, but not limited to, number and <br />type of inspections made, overall Project quality to date, and recommendations. Finally, subject to <br />the requirements of any OCIP, the report shall include an accident report. <br />25.18. If the Work is behind schedule, the CMAR must immediately provide written report of such <br />condition to the Owner and Project Designer and indicate in writing what measures are being taken <br />to bring the Work back on schedule and ensure that the contract completion date is not exce eded. If <br />the Work is greater than thirty (30) days behind schedule and no legitimate requests for time <br />extensions are in process, then the CMAR shall prepare and submit to the Project Designer a <br />recovery schedule for review and approval. Failure of the CMAR to a bide by the directives in this <br />paragraph will give the Owner cause to terminate the Contract and pursue any other legal remedies <br />allowed it by law. <br /> <br />SHOP DRAWINGS, SUBMITTALS, SAMPLES, DATA <br /> <br />25.19. The CMAR shall develop and implement a system for revie w, acceptance or rejection, and <br />processing of all shop drawings and submittals, including the projected lead -time on the CPM <br />schedule. The CMAR shall review this system with the Owner and the Project Designer, and obtain <br />the Owner’s approval prior to implementation. <br />25.20. Within 30 consecutive calendar days of the notice to proceed with each GMP, a schedule for <br />anticipated submission of all shop drawings, product data, samples, and similar submittals shall be <br />prepared by the CMAR and provided to the Project Designer. This schedule shall indicate the <br />items, relevant specification sections, other related submittal data, and the date when these items <br />will be furnished to the Project Designer. <br /> <br />25.21. The CMAR will be responsible for logging all shop drawin gs/submittals and stamping them <br />reviewed and approved prior to submission to the Project Designer. The CMAR shall provide <br />additional copies of any submittals or shop drawings requested by the Owner. The CMAR is to <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78