Browse
Search
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-207-E-AMS-Gilban crisis diversion-Master WC GL AutoXS-10M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:33 PM
Creation date
5/29/2025 1:39:22 PM
Metadata
Fields
Template:
Contract
Date
5/14/2025
Contract Starting Date
5/14/2025
Contract Ending Date
5/22/2025
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 23 <br />Revised 12/24 <br /> <br />23.2. All instructions to the CMA R regarding the interpretation of the plans and specifications will be <br />made only by or through the Project Designer or its designated Project representative. Observations <br />made by official representatives of the Owner shall be conveyed to the Project Design er for review <br />and coordination prior to issuance to the CMAR. <br /> <br />23.3. Where special inspection or testing is required by virtue of any state laws, instructions of the <br />Project Designer, specifications or codes, the CMAR shall give adequate notice to the Pr oject <br />Designer and Owner of the time set for such inspection or test, if the inspection or test will be <br />conducted by a party other than the Project Designer. Such special tests or inspections will be made <br />in the presence of the Project Designer and Owner’s representative or the Owner’s designated <br />agent, and it shall be the CMAR’s responsibility to serve ample notice of such tests. <br /> <br />23.4. All laboratory tests shall be paid by the Owner unless provided otherwise in the Contract <br />Documents except the CMAR shall pay for laboratory tests to establish design mix for concrete, <br />and for additional tests to prove compliance with Contract Documents where materials have tested <br />deficient except when the Owner’s testing laboratory did not follow the appropriate ASTM test ing <br />procedures. <br /> <br />23.5. The CMAR shall perform quality control inspections on the Work of the Subcontractors to guard <br />the Owner against defects and deficiencies in the Work and shall coordinate its activity with the on - <br />site duties of the Project Designer. The CMAR shall advise the Project Designer of any apparent <br />variation and deviation from the intent of the Construction Documents and shall take the necessary <br />action to correct such variations and deviations from the intent of the Construction Documents. T he <br />CMAR shall provide two sets of all inspection reports (in binder form) as part of the job progress <br />meetings to the Project Designer and the Owner. <br />23.6. The Owner reserves the right to independently contract for compliance inspection and testing. The <br />CMAR shall incorporate and coordinate its services with inspections agents provided by the Owner <br />in general accordance with the State of North Carolina, Department of Administration, State <br />Construction Office’s “Special Inspections Guidelines” <br />23.7. The CMAR shall record and effectuate the correction of deficiencies submitted by the Owner and <br />the Project Designer. <br />23.8. The Project Designer shall in all cases make final interpretation of the Contract Documents and rule <br />on compliance of the Work. <br />23.9. Should any Work be covered up or concealed prior to required inspection and approval by the <br />Project Designer, such Work shall be uncovered or exposed for inspection, if so requested by the <br />Project Designer in writing. Inspection of the Work will be made p romptly upon notice from the <br />Subcontractor. All cost involved in uncovering, repairing, replacing, recovering and restoring to <br />design condition, the Work that has been covered or concealed will be paid by the CMAR. <br /> <br />23.10. If any other portion of the Wor k has been covered which the Project Designer has not specifically <br />requested to observe prior to being covered, the Project Designer or Owner’s Representative may <br />request to see such Work and it shall be uncovered by the CMAR. If such Work be found in <br />accordance with the Construction Documents, the cost of uncovering and replacement shall, by <br />appropriate change order, be charged to the Owner. If such Work be found not in accordance with <br />the Contract Documents, the CMAR shall pay such costs. <br /> <br />24. TIME OF COMPLETION, DELAYS, EXTENSION OF TIME <br /> <br />24.1. The pre-construction services schedule shall not exceed one calendar year from the execution of <br />this Agreement. Once the Notice to Proceed is issued, the CMAR will complete construction <br />services within sixteen (16) months and one (1) month for state and local occupancy permitting <br />inspections, for a total of seventeen (17) months. The CMAR shall commence provision of <br />services under this Contract not later than five days after the date of this Contract, and shall fully <br />Docusign Envelope ID: 5A9E3BC2-EAE1-4C35-82D9-B4D6A375FA78
The URL can be used to link to this page
Your browser does not support the video tag.