Browse
Search
Agenda 06-03-2025; 8-o - Contract Approval for Recycling and Municipal Solid Waste Processing
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 06-03-2025 Business Meeting
>
Agenda 06-03-2025; 8-o - Contract Approval for Recycling and Municipal Solid Waste Processing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:42:21 PM
Creation date
5/29/2025 1:10:53 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-o
Document Relationships
Agenda for June 3, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 06-03-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> Contractors are required to accept MSW materials at an agreed upon facility. Contractor must <br /> furnish sufficient facilities, equipment, labor, financial capability, and experience to begin <br /> accepting materials from OCSW within 30 days of contract execution but no later than July 1,2025. <br /> Contractor facilities shall maintain safe and efficient procedures for queuing,weighing, unloading, <br /> screening, and vehicle departure to assure efficient use of the facility by OCSW. The Contractor <br /> shall accept all MSW materials delivered to the agreed upon facility.The agreed upon facility shall <br /> have sufficient capacity and availability for unloading, storage, transfer, or other disposal of <br /> materials so as not to impair delivery of materials from OCSW. <br /> The Contractor shall: <br /> a. have a minimum of 5 years of experience disposal of MSW material, <br /> b. have a minimum of 5 years of technical experience in the disposal of MSW material, <br /> c. provide sufficient financial information to describe the financial condition and strength of the <br /> company, <br /> d. provide qualified staff to handle the day-to-day operations of receiving and disposal of material, <br /> and <br /> e. have the necessary facilities, equipment, and employees to operate a Transfer Station or other <br /> facility to accept MSW material from OCSWM facilities. <br /> 4.2 MSW DISPOSAL <br /> Orange County Solid Waste shall have priority consideration in weighing and off-loading materials. <br /> The maximum total waiting/tipping time from arrival at the Vendors facility, to departure from the <br /> facility, shall not exceed one-half hour per truck. It is the intent of OCSW to deliver MSW on the <br /> same day on which they are collected from all locations mentioned in the list of all materials <br /> accepted under 4.1.At a minimum,the Contractor must be available to receive materials Monday <br /> through Saturdayfrom 7:00 am until 4:00 pm,with holiday observances for New Year's Day, Martin <br /> Luther King Jr. Day, Good Friday, Memorial Day, Juneteenth, Independence Day, Labor Day, <br /> Thanksgiving Day, and Christmas Day. <br /> Orange County Solid Waste shall generally deliver the MSW to the vendor facility. <br /> The Contractor shall provide or act as MSW disposal facility for the materials during the term of <br /> the Contract.The Contractor shall not store or warehouse materials in violation of health and safety <br /> standards and shall conform to all requirements provided for by the state and federal agencies. <br /> 4.3 PROCESSING,TRANSPORTING AND MARKETING <br /> The Contractor shall bear all costs associated with disposal when materials are delivered to the <br /> vendor facility. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.