Browse
Search
Agenda 06-03-2025; 8-n - Approval of FY26 Annual Work Program for Transit Updates
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 06-03-2025 Business Meeting
>
Agenda 06-03-2025; 8-n - Approval of FY26 Annual Work Program for Transit Updates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:40:57 PM
Creation date
5/29/2025 1:08:24 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 3, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 06-03-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br /> REQUEST# FY 2026 FY START DATE <br /> Orange Transit Work Plan Mar 2022 <br /> 18TOCCD5 Request Form Total Project Cost <br /> Operating and/or Capital $ 180,112 <br /> Orange Transit Estimated Operating <br /> Project Name Requesting Agency Project Contact Cost <br /> Base Year $ - <br /> South Greensboro <br /> Street Sidewalk Town of Carrboro Tina Moon FY 2027 $ - <br /> cmoon carrboronc. ov Cumulative $ - <br /> Estimated <br /> Estimated Start Date Completion Notes Orange Transit Estimated Capital Cost <br /> Mar-20 Jun-28 Base Year $ 180,112 <br /> Cumulative $ 180,112 <br /> Project Enter below a summary of the project that may later be used as the project description in <br /> Description/Scope the FY 2026 Work Plan. <br /> Design and installation of sidewalk along one side of South Greensboro Street from north end of Old Pittsboro Road to <br /> Public Works Drive, appropriately 0.9 miles. (TIP#C-5650). Project includes replacing an existing 6-inch waterline, <br /> resurfacing South Greensboro Street from Main Street to Smith Level Road bridge, and lane narrowing to add bike lanes <br /> along the southern segment of corridor. Transit access and transit stops along the corridor will be improved (3 along <br /> corridor and 5 in close proximity). <br />
The URL can be used to link to this page
Your browser does not support the video tag.