Orange County NC Website
37 <br /> Erosion Tyler Sliger <br /> Control Date: 2/12/25 Staff: Tsliger orangecountync.gov <br /> 919-245-2582 <br /> 1. Please add the following signature block to the Final Plat: <br /> A Land Disturbance Permit has/has not been approved for this subdivision. This <br /> certification is not a Land Disturbance Permit or an approval for Land Disturbance. <br /> Subsequent changes to this subdivision may affect the ability to obtain a Land <br /> Disturbance Permit and/or Stormwater Permit. <br /> Erosion Control Officer Date <br /> Applicant Response: Noted, thank you. <br /> 2. Please add the following note to the Final Plat: <br /> Orange County Erosion Control and Stormwater Note: <br /> Orange County regulates: Land Disturbance (UDO Section 2.18); Stormwater <br /> Management (UDO Section 2.21); Impervious Limits (UDO Section 4.2); Stream <br /> Buffer buffers UDO Section 2.20); Floodplain Development (UDO Section 2.6); <br /> Watershed Protection (UDO Section 4.2), and High-Quality Water Zone areas <br /> (HQW) (UDO Section 4.2). Before building, installing, developing or land <br /> disturbing on any parcel or area within the subdivision, please contact the <br /> Orange County Erosion Control and Stormwater Division to determine which <br /> regulations may apply. Orange County also strongly advises the applicant to <br /> submit a Land Disturbance Permit (LDP) before final plat recordation to account <br /> for the total regulated disturbance(s), including any roads and lots within the <br /> subdivision area. If permanent Stormwater Control Measures (SCMs) are <br /> constructed to meet Stormwater Management requirements, then the SCM(s) <br /> may require the recordation of permanent stormwater maintenance easements <br /> and/or access easements (accessible via the nearest public right of way) to <br /> provide perpetual access to the SCM(s) for Orange County inspection. <br /> Applicant Response: Note will be added at time of Final Plat. <br /> 3. Based on the information provided a Land Disturbance Permit will be required for <br /> this project. We recommend including the road disturbance along with the 38-lot <br /> disturbance to be under one permit. <br /> Applicant Response: Land Disturbance Permit will be obtained at time of Final Plat. <br /> 4. The proposal shows the road going over a stream, to comply with Orange County <br /> standards the applicant will need to apply with Orange County for a Buffer <br /> Authorization Certificate. The applicant will also need to apply for a 401/404 <br /> permit with the State. <br /> Applicant Response: Buffer Authorization Certificate has been applied for. <br /> Application for a 401/404 permits are in progress. <br />