Browse
Search
Agenda - 06-02-2004-SAPFO
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-02-2004
>
Agenda - 06-02-2004-SAPFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:07:47 PM
Creation date
8/29/2008 10:42:52 AM
Metadata
Fields
Template:
BOCC
Date
6/2/2004
Document Type
Agenda
Agenda Item
SAPFO
Document Relationships
Minutes - 20040602
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Student Projection 1VIethodology <br />2. <br />3. <br />4, <br />ResponsiGle EntitJ~,fa• Suggestir:g Chmrge -Reviewed and recommended by the <br />Plarn7ing Directors, School Representatives, Techruaal Advisory Committee <br />(SAPFOTAC). <br />Defitzitiorz -The method(s) by which student memberships are calculated for futtn'e <br />years to determine total membership at each combined school level (Elementary, Middle <br />azrd High School),. <br />Standard for: <br />Standm•d for: <br />Chapel Hill Carrboro School District <br />Orange County School District <br />Presently, the average of five models are being used: namely 3, 5, and 10 year <br />cohort survival methods, Orange County Plamring Department Linear Wave and <br />Tischler Linear methods.` <br />Analysis of .Existing Couditiora <br />This will be monitored each year and a <br />trade record of performance will be <br />evaluated. <br />Analysis ofExistirzg Conditions <br />This will be monitored each yeaz and a track <br />record of performance will be evaluated. <br />Reconunendation - <br />No Change from above standard. <br />Reconunendation- <br />No Change from above standard, <br />See Report on one year of performance, The value of a projection model is its <br />prediction of school level capacities at least three years in advance of capacity <br />shortfalls so the Capital Investment Plan (CIP) can respond in advance, <br />'° See attaclunent <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.